Summary
- Problem: German and Austrian landlords with central hot water ("Großanlage": >400 L storage or >3 L in any pipe run) must have Legionella sampled every three years, and the technical rules expect ≥60 °C at the tank outlet and ≥55 °C on the circulation return. Energy-saving pressure pushes temperatures down; nobody has a continuous record until the lab result comes back bad and the health office asks for the logs.
- Customer: Property managers (Hausverwaltungen) and housing associations with 6–30-unit buildings — too small for a BMS, too many buildings to walk. They pay; the caretaker and the sampling lab use it.
- Product: A DIN-rail hub next to the boiler with four clamp-on thermocouple probes (tank outlet, circulation return, cold inlet, one riser), optional RS485 to the heat meter/pump, LoRaWAN uplink to a portal that emits a monthly compliance PDF per building. €399 per building kit + €9/month (estimates).
- Why now: TrinkwV 2023 tightened operator duties; heat-pump retrofits and "Absenkung" debates make 55 °C a daily argument; LoRaWAN coverage in German cities is now routine (municipal utilities' networks) and private gateways cost €100.
- The ask: ~€95k to 1,000 building kits; three paid pilots first, then a housing-association framework deal and a regional digitalisation grant.
External market check (November 2026): UNCERTAIN. The research could not confirm that continuous temperature logging itself (as opposed to periodic Legionella laboratory testing) is a legal requirement; in the pack that is an assumption, not a cited rule. Techem and Minol already own the property-manager relationship through their testing services. Main risk: Soften the compliance-mandate language until checked against the TrinkwV §31 text directly, and consider selling through Techem or Minol as a channel rather than direct to property managers. As researched November 2026 by web search; verify before relying on it. Verdicts are a reading of the evidence found, not a forecast. Competitors and sources found: see the market check in the competition table.
Compliance claim unverified; channel question (November 2026). The pack treats continuous hot-water temperature logging as a compliance requirement. The research could not confirm that logging itself, rather than periodic Legionella laboratory testing, is legally required; check the TrinkwV §31 text before repeating the claim to a buyer. Techem and Minol already hold the property-manager relationship through their testing services, so the better route may be selling through them rather than direct. Kill question unchanged pending Hans's decision; the three property managers in it are still worth asking, and ask them who they buy testing from. As researched November 2026 by web search; verify before relying on it.
Validate demand first
Do this before anything else in this pack: before the business plan, before you order a sample board, and long before you e-mail a factory (section 5). The classic first-time mistake is to source and build first and find out later that nobody wanted it. Hardware mistakes are slow and expensive to undo; 15–20 conversations are cheap.
Compliance claim unverified; channel question (November 2026). The pack treats continuous hot-water temperature logging as a compliance requirement. The research could not confirm that logging itself, rather than periodic Legionella laboratory testing, is legally required; check the TrinkwV §31 text before repeating the claim to a buyer. Techem and Minol already hold the property-manager relationship through their testing services, so the better route may be selling through them rather than direct. Kill question unchanged pending Hans's decision; the three property managers in it are still worth asking, and ask them who they buy testing from. As researched November 2026 by web search; verify before relying on it.
The gate: this idea's kill question
Do three property managers agree to a paid €399 pilot within 4 weeks of first contact?
You pass this section when you can answer that question with evidence you collected yourself, not a guess: written answers from at least ten decision-makers who hold the budget, at least three of whom put something on paper: a signed letter of intent, a paid pilot, or a dated purchase order for the first units. Until then: no factory e-mail, no sample order, no firmware, no logo. If the answer is no, you have lost a few weeks and saved the rest.
Who you are looking for
The audience named in the idea: German and Austrian property managers and housing associations with 6–30-unit buildings.
The problem as the pack states it: German and Austrian landlords with central hot water ("Großanlage": >400 L storage or >3 L in any pipe run) must have Legionella sampled every three years, and the technical rules expect ≥60 °C at the tank outlet and ≥55 °C on the circulation return. Energy-saving pressure pushes temperatures down; nobody has a continuous record until the lab result comes back bad and the health office asks for the logs.
Talk to the people who have the problem and the people who pay; in B2B they are often not the same person, and the one who pays decides.
Where to find them
Communities and associations where this audience actually talks, as far as we know them in November 2026. Confirm each is still active and read its rules on self-promotion before posting; most allow a genuine question about a problem and ban a pitch.
- GEFMA · gefma.de/ — German facility-management association.
- HaustechnikDialog (DE) · haustechnikdialog.de/ — German heating installers and owners; hydronic balancing, heat pumps, legionella.
- ZVSHK · zvshk.de/ — German plumbing/heating installer federation; the local Innung is the way in.
- r/PropertyManagement · reddit.com/r/PropertyManagement/ — property and facility managers.
- The Things Network forum · thethingsnetwork.org/forum/ — LoRaWAN builders, operators and the companies that deploy them.
Beyond the named ones, the same four methods work for every idea on this site:
- Search for communities around the problem, not the product: forums, Facebook groups, Discord servers and newsletters in your own country for the terms in the audience line above. Many of the best groups are national and in the local language; a Dutch or German group beats a global English one for an EU launch.
- Trade associations and their regional meetings for the B2B audiences: one meeting puts twenty buyers in a room, and the association newsletter will often run a short survey for a member.
- LinkedIn: search people by the job titles in the audience line, message ten a day with one question (not a pitch), and ask for twenty minutes. Expect one in five to say yes.
- Your deposit list from the kill question and anyone who replied to the fake door: those are the first interviews, not the last.
The plan: 15–20 conversations, then a fake door
- 15–20 real conversations (ten budget-holders and ten users), fifteen minutes each, using the script below. Before writing a line of code or ordering a board. Write up each one the same day: the problem in their words, what they do today, what it costs them, what they said when you named the price.
- A fake door. One page: the pitch as the headline, a rendered image or a photo of a cardboard mock-up, the price (€399 + €9/month/building, the pack's estimate), and one button. For a business buyer the button is "request a pilot" that leads to a short form and a letter of intent.
- Send it to everyone you interviewed and post it, with the problem question first, in the communities above. Run it for two to four weeks.
- Count against the kill question. Then decide: go, change the idea, or stop.
Interview script (fifteen minutes, problem first)
Ask, then be quiet. Do not describe the product until question 5; if you pitch first you will only hear politeness.
Thanks for the time. I am looking into how German and Austrian property managers and housing associations with 6–30-unit buildings deal with [the problem in their words]; I have not built anything yet and I am trying to find out whether it is worth building.
1. How do you document hot-water temperatures for legionella compliance today, and what did it cost last year in time or fines?
2. What do you do about it today, and what does that cost you in money or time per month?
3. What have you already tried or bought, and why did you stop using it?
4. If this went away tomorrow, what would change for you? (If the answer is "not much", you have your answer.)
5. [Only now describe it in one sentence:] Clamp-on hot-water temperature loggers for multi-family buildings that produce the proof the housing manager needs (≥55/60 °C hold, circulation checks) without a plumber walking the basement. On a scale of one to ten, how likely would you be to buy that at €399 + €9/month/building, and what would make it a ten?
6. Who else should I talk to about this? (Ask for two names.)
Close: "If I build this, can I come back to you with a prototype?" A yes with a calendar date is worth more than any compliment.
Pre-order / pilot message (forum post or direct message)
Subject: Hot-Water Compliance Logger: looking for 3 pilot sites before we build it
I am [your name], [your background]. We are considering building a Hot-Water Compliance Logger: Clamp-on hot-water temperature loggers for multi-family buildings that produce the proof the housing manager needs (≥55/60 °C hold, circulation checks) without a plumber walking the basement. Before we spend money on tooling I want to find out whether this solves a real problem for German and Austrian property managers and housing associations with 6–30-unit buildings.
If it would, I am looking for three pilot customers willing to sign a short letter of intent now and pay €399 + €9/month/building per unit for the first batch, delivered in [month]. The LOI is non-binding on the price; it tells me the problem is real.
Two questions, no pitch: how do you handle this today, and what would make you say no to the above? Twenty minutes on a call this week, or a reply here, both help.
Reading the signal
| Real signal | False positive |
|---|---|
| A refundable deposit, a signed LOI, a paid pilot, a calendar invite for the prototype | "Sounds cool", "I would totally buy that", likes and upvotes |
| They describe the problem unprompted and in detail, with numbers | They agree with your description of the problem |
| They have already paid for a workaround (a product, a service, their own time) | They have never tried anything and are not bothered |
| Landing-page conversion to deposit or form above the pack's pass mark, from cold traffic | Conversion from friends, family and your own network |
| A named budget and a named decision-maker (B2B) | An enthusiastic user who cannot buy |
Go / no-go
- Go to section 3 (business plan) and section 4 (start kit) when the kill question above is met by your own numbers, you have 15–20 written-up conversations, and at least one real signal from the left column per segment you plan to sell to. Only then does section 5 (Who to contact) apply.
- Change the idea when the problem is real but the price, the buyer or the form factor in the pitch is wrong: the interviews will tell you which. Rewrite the pitch and run the fake door again; this is normal and costs a week.
- Stop when the kill question fails on honest numbers, or when nobody you talked to has paid for a workaround. Pick another idea on this site; the boards in the start kit are not wasted, only unused.
The full worksheet, with how to define the segment and run the fake door, is in the playbook → validate demand.
Business plan
Problem & customer
The Trinkwasserverordnung puts the duty on the "Betreiber" — the landlord. Sampling every three years (annually for public buildings) is the visible cost (€150–400 per building per round). The invisible cost is the failed sample: >100 CFU/100 ml triggers notification to the Gesundheitsamt, a risk assessment, thermal disinfection, re-sampling and — if the cause was "tank set to 50 °C to save gas" — a liability argument with the tenants. A continuous temperature log is what every risk-assessment template asks for and almost nobody has below the BMS class.
- Who pays: the Hausverwaltung (bills it to the owners as operating cost, Betriebskosten, where allowed), the Wohnungsgenossenschaft's technical department, or the WEG's board. Decision maker: the technical property manager who signs sampling contracts today.
- Who uses: the caretaker (looks at a traffic light), the sampling lab (asks for the log when a result is marginal), the health office (reads the PDF).
- Adjacent users: heating contractors who maintain the boiler and would install the kit for €150.
Market size (estimates — check)
- TAM: Germany has ≈ 3.3M multi-family buildings; roughly 40% have central hot water with a Großanlage → ~1.3M buildings; Austria adds ~0.15M. At €399 + €108/year → €580M hardware + €155M/year recurring theoretical.
- SAM: buildings managed professionally (managers with ≥20 buildings) in DE/AT ≈ 500k → €200M + €54M/year.
- SOM (3 years): 6–10k buildings via 30–50 managers and two associations → €2.5–4M hardware + €0.7–1M/year recurring. Year 1: 500–1,000 kits.
Sources used: Hamburg and Mannheim city information sheets on TrinkwV 2023 (Großanlage thresholds, 3-year interval, 100 CFU/100 ml action value), Berlin tenants' association guidance, LoRaWAN sensor prices at m2mgermany/reichelt/antratek. Building-stock split: estimate from census data — verify.
Competition (2 searches)
| Alternative | Price (est.) | Why we still win |
|---|---|---|
| Do nothing — sample every 3 years, hope | €150–400 per round | No evidence when a sample fails; the question is only "what did the tank do last winter" |
| Boiler controller's own log (Viessmann, Vaillant, Buderus) | €0 | Logs the tank, not the circulation return; no export, no PDF, proprietary portal |
| Standalone LoRaWAN pipe sensors: Senlab T TEM-LAB-24NS (€194–230), Dragino D20S-LB (~€55), Milesight | €55–230 per sensor | Sensor only; you still need a gateway, a platform and someone to write the compliance logic — managers don't |
| Metering companies' Legionella services (sampling + reporting) | €200–500 per building per round | Periodic, not continuous; our log makes their report better — partner, don't fight |
| BMS / DDC for large buildings | €5–20k | Not viable below 30 units |
| Caretaker with a contact thermometer and a clipboard | labour | Done monthly at best, undocumented |
Wedge: the only sub-€500 kit whose output is the document the health office wants, installed by the existing heating contractor in 30 minutes without opening a pipe.
External market check
Competitors, demand signals and price comparables found by web search in November 2026. Sources are named as found and not linked; as researched November 2026 by web search; verify before relying on it. Verdicts are a reading of the evidence found, not a forecast.
| Who / source | What it is | What it tells us |
|---|---|---|
| TrinkwV §31 (German drinking-water ordinance) | Legionella testing duties | Logging-as-requirement not confirmed; verify the text |
| Techem | Legionella testing services for property managers | Owns the customer relationship; possible channel |
| Minol | Same | Same |
Verdict as researched: UNCERTAIN. Main risk: Soften the compliance-mandate language until checked against the TrinkwV §31 text directly, and consider selling through Techem or Minol as a channel rather than direct to property managers.
Product & value proposition
- Hub: DIN-rail controller (StamPLC-class: ESP32-S3, relays/inputs, RS485) with a LoRaWAN module, mains adapter from the boiler-room socket.
- Probes: four K-type surface thermocouples with pipe clamps or thermal paste + insulation sleeve; the isolated KMeter-class input handles long leads and the boiler's earth potential. Surface-mounted → no drinking-water-contact approval needed.
- Optional: RS485 (M-Bus adapter later) to read the heat meter and the circulation pump status — proves the pump actually ran.
- Rules engine: ≥60 °C tank outlet, ≥55 °C return, tank "Legionellenschaltung" peak detected weekly, circulation pump duty; exceptions logged with duration.
- Portal: building list, traffic lights, monthly PDF per building with the limit lines, export to the manager's software (CSV/API). Sampling-lab share link.
- Pricing (estimates): €399 per building kit (hub + 4 probes + gateway-less if the city has coverage), €149 private gateway if not; €9/month/building for the portal; install by a contractor €150 (their revenue).
Unit economics (estimates, EUR per building kit)
| Item | 1k | 5k |
|---|---|---|
| Electronics BOM (ESP32-S3 module €3, isolated 4-ch thermocouple front end €9, LoRaWAN module EU868 €7, RS485 transceiver isolated €2, DIN enclosure + terminals €6, PSU 230 V→12 V external adapter €4, PCB + passives €5) | 36 | 30 |
| 4× K-type surface probes with clamps + 3 m leads | 14 | 10 |
| PCBA assembly + test (thermocouple channel calibration in a water bath jig) | 5.0 | 3.2 |
| Enclosure (standard DIN housing, printed label — no tooling) | 0 | 0 |
| Packaging + insulation sleeves + install guide | 3.5 | 2.6 |
| Freight + duty to EU | 2.6 | 1.3 |
| Certification amortised (€30k: RED with pre-certified module, EMC, safety, EN 18031) | 30.0 | 6.0 |
| Landed cost | 91 | 53 |
| Direct sale at €399 ex VAT, less €15 fulfilment/support | 384 | 384 |
| Gross margin hardware | €293 (76%) | €331 (86%) |
| Portal €9/month → €108/year at ~€1.50/building/month hosting + support | €90/year (83%) | €90/year (83%) |
Hardware margin is fine; the business is the recurring €9. Price the hardware so the manager's approval is trivial, not so you get rich on it.
Go-to-market
First 100 customers: three Hausverwaltungen in one city (the kill question), reached through the regional property-manager association (VDIV/IVD regional groups), the sampling labs (they know every landlord with a bad result) and two heating contractors who maintain boilers in multi-family buildings. Offer: €399 pilot per building, 3 buildings each, portal free for 6 months, you install the first ones yourself and learn.
Scale: housing-association frameworks (GdW member companies in DE, gemeinnützige Bauvereinigungen in AT), sampling labs as resellers (bundle "sampling + continuous log"), heating-contractor networks (installer margin €60 per kit + install fee), municipal utilities that run LoRaWAN networks and sell smart-building services.
12-month plan
- Q1: kill question (3 paid pilots), works-like kit from StamPLC + KMeter-ISO + LoRaWAN Unit, rules engine, PDF v1, legal review of the TrinkwV/DVGW W 551 wording in the report.
- Q2: own PCB (hub with 4 isolated TC channels + LoRa module + RS485), 30 buildings live, portal v1, contractor install guide.
- Q3: certification (RED with module, EMC, safety, EN 18031), pilot batch 50, first association framework, sampling-lab partnership.
- Q4: production 500–1,000, AT launch, M-Bus/heat-meter reading, API to two property-management software packages.
Team: founder (sales to managers, domain), 1 embedded engineer (ESP-IDF, LoRaWAN, thermocouple front end), 1 web developer (portal, PDF, API), part-time building-services engineer (SHK background) for the rules and the install guide.
Funding to 1,000 units (estimate): NRE €20k (PCB, DIN housing adaptation, probe sourcing, water-bath jig) + certification €30k + portal development €25k + 9 months lean salaries €55k + 1,000 kits at €61 landed €61k = €190k, less revenue from the first 300 kits (€120k) and portal fees → €95k net. Route: pilots paid up front, a regional "Digitalisierung Wohnungswirtschaft" grant, and a €50–75k angel from the property sector. Bootstrap-able if the founder sells first and builds second.
Top risks
- Technical — surface probes read 2–5 K below water temperature. Mitigation: insulation sleeve over the probe, calibrated offset per pipe size, and report "surface temperature, corrected" with the method stated; validate against immersion readings in the pilots.
- Market — managers say "the sampling company handles it". Mitigation: partner with the sampling labs; the log makes their risk assessment faster and the failed-sample conversation shorter.
- Regulatory — you are producing compliance evidence. Never claim "TrinkwV-compliant device"; claim "continuous documentation supporting the operator's duties under TrinkwV and DVGW W 551". Lawyer reviews the PDF wording once.
- Regulatory — tenants' data. Temperatures are building-level, not personal; keep it that way (no per-flat consumption).
- Supply — LoRaWAN module and thermocouple front-end ICs. Both multi-source; the isolated TC amplifier has 2–3 drop-in alternatives. Buy 1k with the first production.
- Coverage — LoRaWAN in basements. Mitigation: external antenna on the hub, private gateway SKU, optional NB-IoT variant in year 2.
Start kit
Boards to start from
| Board | Link | What it contributes | Files (catalogue) | Licence note |
|---|---|---|---|---|
| M5Stack Unit KMeter-ISO (U133-V11) | gongbans.com/db/m5stack-unit-kmeter-iso.html | Isolated thermocouple input; proves the measurement chain on pipes above 60 °C | enclosure/structure files only; electronics not published | Off-the-shelf module; use as bought in the pilot, design your own 4-ch front end for production |
| M5Stack StamPLC (K141) | gongbans.com/db/m5stack-stamplc.html | DIN-rail hub next to the boiler: inputs, relays, RS485, ESP32-S3 | enclosure/structure files only | Off-the-shelf; pilot hub |
| M5Stack Unit LoRaWAN-EU868 (U184-EU868) | gongbans.com/db/m5stack-unit-lorawan-eu868.html | Basement-to-gateway uplink in the pilot | enclosure/structure files only | Off-the-shelf module; in production use a pre-certified LoRaWAN module |
| M5Stack Unit RS485-ISO (U094) | gongbans.com/db/m5stack-unit-rs485-iso.html | Reads heat meters and circulation pumps (Modbus RTU) | enclosure/structure files only | Off-the-shelf module |
None of the four publish electronics — the pilot is assembled from bought modules; production is your own board. Plan for that from day one.
Block diagram
[TC1 tank outlet] [TC2 circ. return] [TC3 cold inlet] [TC4 riser]
\ | | /
[4-ch isolated thermocouple front end] --SPI--> [ESP32-S3 hub, DIN rail] --UART--> [LoRaWAN EU868 module] ~~> gateway ~~> portal
[heat meter / pump] --RS485 (isolated)----------------------^ |
[230 V socket] --> [external 12 V adapter] --> 3.3 V -----------+
Portal: rules (≥60/≥55 °C, weekly peak, pump duty) -> monthly PDF per building -> manager / lab / health office
Engineering gap: a 4-channel isolated thermocouple board (the Unit is single-channel), surface-probe accuracy method, the rules engine mapped to DVGW W 551 practice, the PDF nobody argues with, Modbus profiles for the common heat meters, and LoRaWAN fleet management (join, keys, downlinks for config).
Starter BOM (estimates)
| Part | Est. unit cost | Notes |
|---|---|---|
| ESP32-S3-WROOM-1 | €3 | Multi-source |
| Thermocouple-to-digital converter ×4 (MAX31855/MAX31856-class) + digital isolator | €9 | 2–3 alternatives; watch lead times |
| LoRaWAN module EU868, pre-certified (RAK/Seeed/Murata-class) | €7 | Multi-source; pre-certification saves €8k |
| Isolated RS485 transceiver | €2 | Multi-source |
| K-type surface probe, pipe-clamp, 3 m fibreglass lead ×4 | €14 | Many suppliers; specify tolerance class 1 |
| DIN-rail enclosure 6 TE + pluggable terminals | €6 | Standard catalogue parts |
| 12 V/1 A wall adapter, CE-marked | €4 | Buy certified |
| SMA bulkhead + 868 MHz antenna | €2.5 |
Firmware/software starting point
- ESP-IDF with the LoRaWAN stack of your module vendor (most pre-certified modules run AT commands or LoRaMac-node; search for the vendor's reference).
- ChirpStack (open-source LoRaWAN network server) or The Things Stack for the pilot; many German municipal utilities offer TTN/TTS coverage.
- Node-RED for the first rules engine, then a proper service; Grafana for the internal view.
- PDF generation: any server-side library (search for your stack); the content matters more than the tool.
- Modbus RTU: libmodbus or the ESP-IDF Modbus component.
12-week build plan
| Weeks | Gate | Exit criteria |
|---|---|---|
| 1–2 | Validate | Three property managers agree to a paid €399 pilot within 4 weeks of first contact (the kill question). Fewer than three: stop or change the buyer (try sampling labs). Meanwhile one StamPLC + KMeter-ISO + LoRaWAN kit logs your own or a friend's boiler room. |
| 3–5 | Works-like | 4-channel kit from modules, surface vs immersion comparison on three pipe sizes within ±2 K after correction, LoRaWAN uplink every 10 min, PDF v1 reviewed by one sampling lab. |
| 6–8 | Looks-like + EVT | Own hub PCB v1 in a DIN housing, 9 buildings live (3 managers × 3), contractor installs one in under 30 min from the guide; EMC pre-scan. |
| 9–10 | DVT + pre-compliance | PCB v2, RED/EMC/safety pre-test, EN 18031 checklist, water-bath calibration jig built, lawyer-reviewed report wording. |
| 11–12 | Pilot batch | 50 kits from a CM, golden sample, 30 buildings live, first manager converts to the €9/month portal; pump/heat-meter reading demonstrated on two brands. |
Certification checklist (EU)
- CE / RED: LoRaWAN → EN 300 220 (radio), EN 301 489-1/-3 (EMC), EN 62368-1 (safety; low voltage only, external certified adapter). A pre-certified module reduces radio testing to a system-level check.
- RED delegated act — EN 18031-1 (and -2 if personal data: building-level temperatures are not, keep it that way): applies; LoRaWAN devices are internet-connected via the gateway.
- CRA: reporting duties in force since September 2026, full obligations December 2027; signed firmware over LoRaWAN downlink (small payloads — plan a local USB update path too), SBOM, disclosure policy.
- RoHS, REACH, WEEE registration (DE: stiftung ear; AT: EAK); packaging (LUCID).
- Battery regulation: not applicable (mains-powered hub); if you add a battery-powered riser node later, the Battery Regulation and UN 38.3 apply.
- GDPR: no personal data on device; portal has manager accounts → standard processor agreement.
- Drinking-water regulations: surface-mounted probes → no DVGW/UBA contact approval. Do not move the probe into the water.
- Estimated test costs: RED system test with pre-certified module €6–9k, EMC €5k, safety €3k, EN 18031 €12–18k, documentation €2k. Budget €30k.
Validation toolkit
- Kill question: do three property managers sign a paid €399 pilot within 4 weeks of first contact? Cheapest experiment: a one-page offer with a sample monthly PDF (mock data from your own boiler room, made with the Unit kit) and 15 phone calls. Cost < €400 and your time.
- 5-question interview (technical property manager): 1) How many of your buildings have central hot water, and who sets the tank temperature? 2) What happened the last time a Legionella sample came back positive — hours, euros, letters? 3) Do you have any temperature record between sampling rounds? 4) Who would install a clamp-on sensor — your caretaker, the heating contractor, or nobody? 5) Would a monthly PDF per building for €9 be something you'd forward to the owners, and who approves €399 per building?
- Landing page: headline "Proof your hot water stayed above 60 °C — every day, every building." Bullets: "Clamp-on sensors, 30-minute install, no pipe opened"; "Monthly compliance PDF per building for the health office and the lab"; "€399 per building + €9/month — no BMS, no plumber".
- Pass threshold: 3 paid pilots in 4 weeks; then 30 buildings under contract within 3 months of pilot start.
First production checklist
- Samples: 3 module kits, 10 EVT hubs, 50 pilot kits; archive two.
- Golden sample: water-bath calibration record per channel, LoRaWAN link budget test from a basement, signed.
- DFM review: terminal pitch for thermocouple wire, isolation creepage on the TC front end, antenna cable routing, DIN clip strength.
- MOQ talk: PCBA 500; LoRa module 1k reel; probes 1k; DIN housings are catalogue parts.
- QC/AQL: level II, AQL 1.0/2.5; 100% channel test at two temperatures; 100% LoRaWAN join test.
- Packaging: kit box with probes coiled, insulation sleeves, clamps, printed install guide with QR to the portal.
- Incoterms: FOB Shenzhen; no batteries.
Who to contact
On file: 1 board publisher (M5Stack). Only useful once section 2 (validate demand) has passed. Everything below comes from gongban.db, the directory behind this site. It names the companies that publish the boards this idea is built from, the manufacturers on file, and directory entries in the same product category. None of it is a verified supplier relationship for this specific idea: nobody has quoted it yet. Company websites only; no personal contacts are published.
Board publishers (direct)
- M5Stack — community / maker brand; 274 boards in the catalogue; files via M5Stack M5_Hardware repo · github.com/m5stack/M5_Hardware. Boards used here: M5Stack Unit KMeter-ISO (U133-V11) (isolated thermocouple input, good above 100 °C pipes); M5Stack StamPLC (K141) (DIN-rail hub next to the boiler); M5Stack Unit LoRaWAN-EU868 (U184-EU868) (basement-to-roof range); M5Stack Unit RS485-ISO (U094) (read existing heat meters and pumps). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.
Manufacturing (PCBA / EMS) on file
- Kingbrother / King Brother Technology · global.kingbrother.com/ — PCB fab + EMS; see the Kingbrother SOM page on this site.
- Foxlink (SZ) (正崴精密工业(深圳)有限公司) · foxconn.com — PCBA + cable assembly EMS: Cable assembly; PCBA; connector; OEM for major electronics brands.
- ManThink · manthink.cn/ — open-source LoRaWAN gateway (direct supplier submission): ManThink GD6 open-source LoRaWAN gateway. Supplier reference price (Nov 2026, GD61 indoor, 8 channels): basic Ethernet/Wi-Fi US$50; 4G+PoE US$70; global 4G+PoE US$87; power kit +US$5. MOQ and lead time on request.
Also in the directory (category match, not idea-specific)
Companies in the gongban.db solution-house directory whose product category overlaps this idea. They were matched on the idea's tags, not on this design; none has seen it.
- RAK Wireless (深圳锐凌无线技术有限公司) · rakwireless.com — LoRaWAN gateway / module OEM: RAK2245 / RAK4630 LoRaWAN; Helium compatible; CE/FCC; OEM. (LoRaWAN gateways / modules)
- Dragino Technology (创联技术(深圳)有限公司) · dragino.com — LoRaWAN gateway / sensor OEM: LG308 LoRa gateway; LHT65 temp/humidity sensor; open-source firmware OEM. (LoRaWAN gateways / modules)
- Xinhua Control (XHC) (深圳市欣华宸科技有限公司) · xhciot.com — Industrial edge gateway / RTU OEM: Industrial edge gateway; RTU; RS485/Modbus; 4G/LoRa. (Industrial RS485 / Modbus gateways)
- Kongtai Technology (深圳市控泰科技有限公司) · kongtai.net — SCADA / PLC / edge computing OEM: PLC; HMI; SCADA; edge gateway. (Industrial RS485 / Modbus gateways)
MOQ and landed cost
Apart from the ManThink reference price above, gongban.db holds no MOQ, unit-price or tariff data for these companies, so none is shown. Get the numbers from the quote (the e-mail below asks for them) and run them through the landed-cost worksheet in the playbook. The starter BOM in the start kit section is an estimate, not a quote.
Outreach e-mail, ready to send
Fill in the [brackets], keep it short, and send it to the sales or "contact us" address on the company's own website. The Chinese version is the same letter; sending both in one mail is normal. How to read the reply: playbook → the first quote.
A. To a board publisher — samples and volume price (send to the sales / "contact us" address on the M5Stack website)
Subject: Sample order and volume pricing — M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094) — for a Hot-Water Compliance Logger
Hello [company] sales team,
I am [your name], founder of [your company] in [country]. We are developing a Hot-Water Compliance Logger: Clamp-on hot-water temperature loggers for multi-family buildings that produce the proof the housing manager needs (≥55/60 °C hold, circulation checks) without a plumber walking the basement. The design is built around your M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094).
Could you please send:
1. Price and lead time for [10] sample units of each: M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094).
2. Unit pricing at 100 / 500 / 1,000 pieces, EXW Shenzhen and DDP [your city], including packaging.
3. Whether a customised variant is possible (our enclosure, connector, or firmware pre-loaded), with the NRE and MOQ for it.
4. Radio test reports or module certification documents, if available, so we can plan EU (CE/RED) certification.
5. Payment terms and accepted methods for a first order.
We can share our block diagram and target quantities under NDA if that helps.
Best regards,
[your name] · [your company] · [website] · [phone / WhatsApp]
A. 中文版
主题:样品订购及批量报价 — M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094) — 用于Hot-Water Compliance Logger
[公司]销售团队,您好:
我是[姓名],[国家][公司]的创始人。我们正在开发一款Hot-Water Compliance Logger:Clamp-on hot-water temperature loggers for multi-family buildings that produce the proof the housing manager needs (≥55/60 °C hold, circulation checks) without a plumber walking the basement。产品设计基于贵司的M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094)。
请提供以下信息:
1. 各[10]片样品的单价和交期:M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094)。
2. 100 / 500 / 1,000 片的批量单价(深圳EXW及DDP到[城市]),含包装。
3. 是否可以定制(外壳、接口或预烧录固件),以及定制的NRE费用和最小起订量(MOQ)。
4. 如有,请提供射频测试报告或模组认证文件,以便我们规划欧盟CE/RED认证。
5. 首单的付款方式和条件。
如有需要,我们可在签署NDA后提供框图和目标数量。
祝好,
[姓名] · [公司] · [网站] · [电话 / WhatsApp]
B. To a PCBA / EMS house — quote from the open design files (send to Kingbrother, Foxlink or any assembler you vet; see the playbook)
Subject: PCBA quote from open design files — Hot-Water Compliance Logger, [50] prototypes + [500] production units
Hello [company] sales team,
I am [your name], founder of [your company] in [country]. We are building a Hot-Water Compliance Logger: Clamp-on hot-water temperature loggers for multi-family buildings that produce the proof the housing manager needs (≥55/60 °C hold, circulation checks) without a plumber walking the basement. The design starts from published open-hardware files (M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094); schematic, PCB and BOM available) with our own modifications.
Could you quote:
1. PCB fabrication + SMT assembly for [50] prototype units and [500 / 1,000] production units, including component sourcing (we provide the BOM with manufacturer part numbers).
2. NRE, stencil and test-fixture costs, and your DFM review fee if any.
3. Lead time from file approval to shipment, and your QC / functional-test process.
4. Box build (enclosure, cable, packaging) if you offer it.
5. Terms: EXW / FOB Shenzhen or DDP [your city]; payment terms for a first order.
Design files: [link to Gerber, BOM and pick-and-place files].
Best regards,
[your name] · [your company] · [website] · [phone / WhatsApp]
B. 中文版
主题:基于开源设计文件的PCBA报价 — Hot-Water Compliance Logger,[50]台样机 + [500]台量产
[公司]销售团队,您好:
我是[姓名],[国家][公司]的创始人。我们正在开发一款Hot-Water Compliance Logger:Clamp-on hot-water temperature loggers for multi-family buildings that produce the proof the housing manager needs (≥55/60 °C hold, circulation checks) without a plumber walking the basement。设计基于已公开的开源硬件文件(M5Stack Unit KMeter-ISO (U133-V11), M5Stack StamPLC (K141), M5Stack Unit LoRaWAN-EU868 (U184-EU868), M5Stack Unit RS485-ISO (U094);含原理图、PCB和BOM),并做了我们自己的修改。
请报价:
1. [50]台样机和[500 / 1,000]台量产的PCB制板+SMT贴片,含元器件采购(我们提供带厂商料号的BOM)。
2. NRE、钢网和测试治具费用,以及DFM评审费用(如有)。
3. 从文件确认到出货的交期,以及贵司的QC/功能测试流程。
4. 如可提供,整机组装(外壳、线材、包装)报价。
5. 贸易条款:深圳EXW/FOB或DDP到[城市];首单付款条件。
设计文件:[Gerber、BOM和坐标文件链接]。
祝好,
[姓名] · [公司] · [网站] · [电话 / WhatsApp]
Next steps (this week)
- Order StamPLC, KMeter-ISO, LoRaWAN-EU868 and RS485-ISO units plus four K-type surface probes; clamp them on the nearest boiler room you can access and log for a week.
- Draft the one-page monthly compliance PDF with mock data and the TrinkwV/DVGW W 551 limit lines; show it to one sampling lab and ask what they'd change.
- Call 15 property managers from the regional association list with the pilot offer; book the three.