Concept, not a product. Concept generated by the GONGBANS inventor from the public catalogue, then expanded into a start pack. Not a product, not validated; every number (market, BOM, price, effort, certification cost) is a rough estimate to be checked, not a quote. Check each board's licence before commercial use. Not legal, tax or investment advice.

New here? Start here → explains what a gongban is, the four steps and the first-timer mistakes. Come back to this pack afterwards.

Effort (estimate)12–16 team-weeks
Unit BOM (estimate)€22–32 (estimate)
Price (estimate)€89–129 pair (estimate)
Boards referenced3 catalogue boards

Order of operations: read the summary, then validate demand (section 2) with real customers before you touch the start kit or e-mail anyone in Who to contact (section 5). New to hardware? The zero-experience founder playbook covers validation, samples, the first quote, CE/FCC, customs and fulfilment for all 100 ideas.

1 · Summary · the one-page version

Summary

  • Problem: Outbuildings with electric heaters, saunas, pumps, kilns, compressors and EV chargers are energy blind spots. Wi-Fi rarely reaches them, so smart meters/plugs don't work there. Owners find out about the sauna left on or the frost heater running all winter only from the annual bill.
  • Customer: Homeowners with outbuildings (DE, NL, Nordics, AT), small farms and stables, holiday-park operators (information per cabin), allotment associations (information, not billing). The owner pays and uses it.
  • Product: A DIN-rail module in the outbuilding's sub-panel with a clamp-on current transformer, measuring kWh and peak power. It talks over the existing mains cable to a plug-in head unit in the house, which connects to the home network and an app. Alerts for "sauna left on", "frost heater running in April", and monthly cost at the user's own tariff.
  • Why now: Energy prices made "where does my power go?" mainstream; heat pumps, saunas and garden offices added big loads in outbuildings; PLC chips are cheap; the cable to the outbuilding is already there.
  • The ask: About €180–230k (estimate) to the first 1,000 pairs, via electrician pre-orders, an energy-efficiency grant, and one angel. Much less if you use existing certified modules instead of designing PLC coupling yourself.
2 · Validate demand · before anything else

Validate demand first

Do this before anything else in this pack: before the business plan, before you order a sample board, and long before you e-mail a factory (section 5). The classic first-time mistake is to source and build first and find out later that nobody wanted it. Hardware mistakes are slow and expensive to undo; 15–20 conversations are cheap.

The gate: this idea's kill question

Does the PLC link survive through a residual-current device and 50 m of garden cable in 10 houses? And will buyers accept the Tuya-cloud dependency for the app?

You pass this section when you can answer that question with evidence you collected yourself, not a guess: a measured conversion on a fake-door landing page for the consumer side and, for the business side, at least three decision-makers who put something on paper: a letter of intent, a paid pilot or a purchase order. Until then: no factory e-mail, no sample order, no firmware, no logo. If the answer is no, you have lost a few weeks and saved the rest.

Who you are looking for

The audience named in the idea: Homeowners with outbuildings, small farms, allotment associations with shared power, holiday-park operators.

The problem as the pack states it: Outbuildings with electric heaters, saunas, pumps, kilns, compressors and EV chargers are energy blind spots. Wi-Fi rarely reaches them, so smart meters/plugs don't work there. Owners find out about the sauna left on or the frost heater running all winter only from the annual bill.

Talk to the people who have the problem and the people who pay; in B2B they are often not the same person, and the one who pays decides.

Where to find them

Communities and associations where this audience actually talks, as far as we know them in November 2026. Confirm each is still active and read its rules on self-promotion before posting; most allow a genuine question about a problem and ban a pitch.

  • r/homeassistant · reddit.com/r/homeassistant/ — the largest home-automation community; very receptive to new sensors and ESP32 devices.
  • Home Assistant Community forum · community.home-assistant.io/ — where new devices get adopted or ignored; also the Home Assistant and ESPHome Discord servers.
  • Tweakers forum (NL) · gathering.tweakers.net/ — Dutch tech forum with active energy, domotica and smart-meter sections.
  • Photovoltaikforum (DE) · photovoltaikforum.com/ — German PV, battery, heat-pump and dynamic-tariff owners.
  • Bundesverband der Kleingartenvereine Deutschlands (DE) · kleingarten-bund.de/ — German allotment federation; the regional and local Kleingartenvereine are the way in.

Beyond the named ones, the same four methods work for every idea on this site:

  • Search for communities around the problem, not the product: forums, Facebook groups, Discord servers and newsletters in your own country for the terms in the audience line above. Many of the best groups are national and in the local language; a Dutch or German group beats a global English one for an EU launch.
  • Trade associations and their regional meetings for the B2B audiences: one meeting puts twenty buyers in a room, and the association newsletter will often run a short survey for a member.
  • LinkedIn: search people by the job titles in the audience line, message ten a day with one question (not a pitch), and ask for twenty minutes. Expect one in five to say yes.
  • Your deposit list from the kill question and anyone who replied to the fake door: those are the first interviews, not the last.

The plan: 15–20 conversations, then a fake door

  1. 15–20 real conversations (ten buyers from the business side and ten from the consumer side), fifteen minutes each, using the script below. Before writing a line of code or ordering a board. Write up each one the same day: the problem in their words, what they do today, what it costs them, what they said when you named the price.
  2. A fake door. One page: the pitch as the headline, a rendered image or a photo of a cardboard mock-up, the price (€89–129 pair (estimate), the pack's estimate), and one button. Two buttons: a refundable deposit or waitlist for consumers, "request a pilot" for businesses.
  3. Send it to everyone you interviewed and post it, with the problem question first, in the communities above. Run it for two to four weeks.
  4. Count against the kill question. Then decide: go, change the idea, or stop.

Interview script (fifteen minutes, problem first)

Ask, then be quiet. Do not describe the product until question 5; if you pitch first you will only hear politeness.

Pre-order / pilot message (forum post or direct message)

Reading the signal

Real signalFalse positive
A refundable deposit, a signed LOI, a paid pilot, a calendar invite for the prototype"Sounds cool", "I would totally buy that", likes and upvotes
They describe the problem unprompted and in detail, with numbersThey agree with your description of the problem
They have already paid for a workaround (a product, a service, their own time)They have never tried anything and are not bothered
Landing-page conversion to deposit or form above the pack's pass mark, from cold trafficConversion from friends, family and your own network
A named budget and a named decision-maker (B2B)An enthusiastic user who cannot buy

Go / no-go

  • Go to section 3 (business plan) and section 4 (start kit) when the kill question above is met by your own numbers, you have 15–20 written-up conversations, and at least one real signal from the left column per segment you plan to sell to. Only then does section 5 (Who to contact) apply.
  • Change the idea when the problem is real but the price, the buyer or the form factor in the pitch is wrong: the interviews will tell you which. Rewrite the pitch and run the fake door again; this is normal and costs a week.
  • Stop when the kill question fails on honest numbers, or when nobody you talked to has paid for a workaround. Pick another idea on this site; the boards in the start kit are not wasted, only unused.

The full worksheet, with how to define the segment and run the fake door, is in the playbook → validate demand.

3 · Business plan · estimates, not a forecast

Business plan

Problem & customer

Primary: homeowners with a powered outbuilding (garden office, sauna, workshop) in DE/NL/Nordics/AT, typically on a sub-panel fed by an underground cable 10–60 m long. They pay; an electrician installs (DIN-rail = fixed installation; in most countries that means an electrician). Secondary: stables and small farms (pumps, heaters, water-trough heaters). Third: holiday parks — consumption per cabin for operational decisions (not billing).

Market size (estimates)

  • DE + NL + AT + Nordics: ~25 M owner-occupied houses; assume 10% have a powered outbuilding with meaningful loads → ~2.5 M. Plus small farms/stables.
  • TAM: 2.5 M × €109 ≈ €270 M.
  • SAM: owners who care about energy and would pay an electrician to install (~10%) → ~€27 M.
  • SOM (3 years): 2% of SAM → ~5k pairs → ~€550k. Niche; better as one product in an energy-monitoring range, or white-labelled by an energy company.

Competition

AlternativePrice (estimate)Weakness we attack
Wi-Fi DIN-rail energy meter (e.g. Shelly Pro EM-50 at ~€78) + a HomePlug powerline adapter pair to bring the network to the outbuilding€78 + €60–120 adaptersWorks — this is the real competitor. But: two products, a powerline adapter sitting on a socket in the shed, Ethernet/Wi-Fi bridging config
Meter in the main panel measuring the outbuilding feeder€50–80Best solution if the feeder leaves the main panel and there's space — no PLC needed at all
Wi-Fi meter + Wi-Fi mesh/outdoor access point€80 + €80–150Extra network gear; garden Wi-Fi often unreliable
Smart plugs on individual devices€15–25 eachDoesn't work for hard-wired saunas, heaters, pumps
Home-energy monitors with CT clamps on the main supply€50–150See the whole house, not the outbuilding
Do nothing: read the annual billFree—

Wedge (narrow, be honest): one-box install, no network gear in the outbuilding, outbuilding-specific alerts (sauna, frost heater, pump short-cycling). If the electrician can put the CT on the feeder in the main panel, the customer doesn't need you — target installations where that isn't possible (sub-panel fed from a separate meter or long cable, no space in the main panel, or the shed has its own sub-circuits to watch).

Product & value proposition

  • Outbuilding unit (DIN-rail, 1–2 modules wide): CT clamp input (Seeed Grove-Electricity Sensor as a sensing reference; production: proper metering IC + CT), voltage sense, metering-grade energy calculation, PLC modem (Tuya S130N-ISI in the original concept — see the band warning), isolated supply (Hi-Link HLK-PMxx 3 W, 85–265 VAC, with EMC circuit variant).
  • Head unit (plug-in, in the house): PLC coordinator + Wi-Fi to the app.
  • The Tuya cloud dependency: with Tuya modules and Tuya's app/white-label tools, data goes through Tuya's cloud; no internet = no app (the meter still counts locally). The S130N-ISI is a station module: you also need a matching coordinator in the head unit — check that Tuya supplies one and whether it works outside China's grid-PLC ecosystem.
  • Tuya-free alternative (recommended to evaluate first):
  • (a) CENELEC-band narrowband PLC (band C/B for consumer use, EN 50065) modem in both units + a local hub/app (Home Assistant integration, MQTT) or your own EU cloud; or
  • (b) 868 MHz sub-GHz radio instead of PLC — often reaches 30–100 m to a garden building and avoids the coupling and emission issues entirely. Ask: is PLC actually needed?
  • App: kWh per day/month, peak power, cost at your tariff, alerts (load on longer than X h, load during "away", unusual night consumption), export.

Pricing (estimates): €109 pair (outbuilding unit + head unit) RRP; €69 extra outbuilding unit; installer price €80/pair. No subscription in the Tuya-free local version; optional €1/month cloud history.

Unit economics (estimates per pair, ex-VAT)

Item1k pairs5k pairs
BOM outbuilding unit (PLC modem + coupling transformer/caps, metering IC, CT clamp, HLK-PM supply, MCU, terminals, PCB)€17.00€13.50
BOM head unit (PLC modem + coupling, Wi-Fi MCU, supply, plug housing parts)€11.00€8.50
Assembly & test (2 units, hi-pot, metering calibration, PLC link test)€4.50€3.00
Enclosures (DIN-rail V-0 + plug-in housing with mains pins)€4.50€3.00
Packaging€1.50€1.00
Freight + duty to EU€1.20€0.80
Certification amortised (~€40k: LVD for both, EMC incl. PLC emissions, RED for Wi-Fi)€40.00€8.00
Landed cost€79.70€37.80
Net revenue (direct €92 ex-VAT; installer/wholesale €67)€92€67
Gross margin€12.30 (13%)€29.20 (44%)

The plug-in head unit with mains pins is a whole second mains product — it doubles your safety testing. Option: put the head unit on a DIN rail in the main panel too (electrician installs both) — simpler certification, and it's the same install visit.

Go-to-market

First 100 customers:

  • Electricians who install saunas, garden offices and outbuilding sub-panels: they're on site with the panel open. Give 20 installers a demo kit and margin.
  • Sauna, garden-office and tiny-house builders: bundle the monitor as an option at the point of sale.
  • Energy-saving communities (home-energy forums, smart-meter/home-automation communities, energy-advice associations).
  • Horse/stable associations (frost heaters for water, lights, pumps).

Scale: electrical wholesale; white-label for an energy retailer or a sauna brand; holiday-park operators.

12-month plan

QuarterMilestones
Q1Band/EMC check of the PLC choice with a lab; kill test: PLC link in 10 houses through RCD + 50 m cable; Tuya vs Tuya-free decision
Q2Works-like pairs in 20 houses; app/alerts; installer feedback
Q3EVT/DVT; LVD/EMC (incl. conducted emissions)/RED testing
Q41,000 pairs; 50 installers; one sauna/garden-office brand bundle

Team: 1 power/metering engineer (mains + PLC coupling + EMC — rare skills, hire or contract someone who has done PLC before), 1 embedded/app developer, founder on installer channel.

Funding to the first 1,000 pairs (estimates): NRE €80k (hardware 2 units €40k, firmware/app €30k, tooling €10k) + certification €40k + 1,000 pairs landed ~€40k + 9 months lean costs €60k ≈ €220k. Minus installer pre-orders (300 pairs × €80 ≈ €24k) and an energy-efficiency/SME innovation grant (€30–60k where available) → ~€140–170k. If you switch to sub-GHz radio instead of PLC, NRE and certification risk drop noticeably.

Top risks

RiskMitigation
Regulatory/EMC: 0–12 MHz PLC emissions on EU mains (and interference complaints)Lab check in week 1; if negative, CENELEC-band modem or 868 MHz radio
Technical: PLC through RCDs, different phases, long garden cable, noisy loads (heat-pump inverters, LED drivers)Kill test in 10 real houses; phase coupler advice; fallback radio
Tuya dependency: cloud required for app; GDPR/data residency (consumption profiles reveal presence/habits = personal data); coordinator availability for EU useTuya-free design path; if Tuya: DPA, data-location check, disclose on the box
Market: a Wi-Fi meter + powerline adapter is "good enough"; or the CT goes in the main panelTarget only installs where that doesn't work; sell through sauna/garden-office builders
Regulatory: customers using it for billing"Not for billing" label; offer MID-meter guidance
Supply: PLC modem ecosystem (Chinese-standard parts may not suit EU)Pick a modem with EU deployments; keep metering front-end separate
4 · Start kit · boards, BOM, build plan, certification

Start kit

Boards to start from

BoardLinkWhat it contributesFiles (catalogue)Licence note
Tuya S130N-ISI PLC modulegongbans.com/db/tuya-s130n-isi.htmlPLC station modem (IEEE 1901.1, 0–12 MHz, Cortex-M4 + DSP, UART/SPI/I2C) — needs external mains couplingDatasheet public, files via maker (no open schematic/PCB)Tuya platform terms; check EU suitability of the band
Seeed Grove-Electricity Sensorgongbans.com/db/seeed-grove-electricity-sensor.htmlCT current-sensing referenceSchematicCheck Seeed's licence for the wiki design files
Hi-Link HLK-PMxx 3 W isolated AC-DCgongbans.com/db/hilink-pmxx.htmlSmall isolated supply (EMC-circuit variant listed)Datasheet public, files via makerCommercial module; check its safety approvals

Block diagram

 OUTBUILDING SUB-PANEL (DIN rail)                                         HOUSE
 [CT clamp on feeder] -> [metering IC] -> [MCU] -> [PLC modem] -[coupling]-> ═══ mains cable (10-60 m, via RCD) ═══ -[coupling]-> [PLC coordinator] -> [Wi-Fi MCU] -> app (Tuya cloud | local hub/own EU cloud)
 [voltage sense] ------^                   |
 [HLK-PM 3 W supply]                [local kWh store, LEDs]
 Alternative path: replace both PLC blocks with 868 MHz radios (no coupling, no conducted-emission issue).

Engineering gap: mains coupling circuits and EMC filtering for PLC (the specialist part), metering calibration, the head unit, the alert logic, and — critically — a decision on PLC band vs radio.

Starter BOM (estimates at 1k, per pair)

PartEst. costNotes
2× PLC modem (S130N-ISI + coordinator, or CENELEC modem)€8–12Check coordinator availability and EU band suitability first
PLC coupling (transformer, capacitors, protection) ×2€3.00X-capacitors and surge protection — safety-critical
Metering IC + CT clamp€4.50Split-core CT for retrofit
MCU + Wi-Fi MCU (head unit)€3.50
2× isolated supply (HLK-PMxx)€3.00
PCBs, terminals, fuses, varistors€3.00
Enclosures (DIN + plug-in/DIN)€4.50Tooling ~€10–15k

Firmware/software starting point

  • Tuya route: Tuya developer platform docs for the PLC series (module + coordinator), Tuya MCU-SDK for your metering MCU.
  • Tuya-free route: search "Home Assistant MQTT energy" for a local integration (Home Assistant's energy dashboard is a natural home for this data); a small MQTT broker (search "Eclipse Mosquitto"); for 868 MHz, search "RadioLib" (a widely used Arduino radio library).
  • Metering: use the metering-IC vendor's application notes for calibration.

12-week build plan

WeeksPhaseExit criteria
1–2ValidateTwo kill tests: (1) EMC lab opinion on the PLC band (go/no-go for S130N); (2) dev-kit PLC (or radio) link between a house socket and an outbuilding socket in 10 houses: ≥99% of messages delivered, through the RCD, over the real cable. Plus 10 installer interviews
3–5Works-likeMetering ±2% vs a reference meter at 100 W–3.5 kW; alerts working; 10 houses
6–8Looks-like + EVTDIN enclosure + head unit; 30 pairs; installers fit them in <20 min
9–10DVT + pre-complianceSafety pre-assessment (EN 62368-1 / IEC 61010-1 for the measuring unit as appropriate), conducted-emission pre-scan of the PLC signal, RED for Wi-Fi
11–12Pilot batch50 pairs via 10 installers; 0 safety issues; ≥1 alert per house acted on in the first month

Certification checklist (EU)

  • LVD / safety: DIN-rail measuring unit — IEC/EN 61010-1 (measurement equipment) or EN 62368-1, depending on classification; plug-in head unit with mains pins has its own requirements. Est. €12–20k for both.
  • EMC: EN 61000-6-1/-6-3 (or product-specific), plus PLC-specific conducted emissions: EN 50065-1 for CENELEC 3–148.5 kHz devices; EN 50561-1 for in-home PLC in the 1.6/2–30 MHz range. A 0–12 MHz modem straddles these — get a lab opinion. Est. €8–15k.
  • RED: Wi-Fi in the head unit: EN 300 328, EN 301 489-1/-17, EN 62311. Est. €5–8k.
  • RED delegated act (EN 18031-1/-2): head unit is internet-connected; consumption data is personal data. Self-assessment €3–6k.
  • CRA: reporting from 11 Sept 2026, full from 11 Dec 2027: updates, SBOM, vulnerability handling (both units have firmware).
  • Metrology: not a MID billing meter — label "for information only, not for billing".
  • RoHS, REACH, WEEE, packaging registration.
  • GDPR: consumption profiles reveal presence/habits → personal data. Tuya route: DPA + data location; local route: minimal.
  • Total estimate: €30–50k.

Validation toolkit

  • Kill question: Does the PLC link survive through a residual-current device and 50 m of garden cable in 10 houses — and is its band legal in the EU? And will buyers accept the Tuya-cloud dependency for the app?
  • Cheapest experiment (~€300): a pair of off-the-shelf powerline adapters + a pair of 868 MHz dev boards in 10 friends' gardens to see which link type works; meanwhile ask an EMC lab for an opinion on the S130N band.
  • 5-question interview (owner/installer): 1) What's in your outbuilding that uses power, and how is it fed? 2) Do you know what it costs per year? 3) Have you had a "left on" incident (sauna, heater)? 4) Is there Wi-Fi out there, and have you tried to fix that? 5) At €109 plus installation, would you buy it — and would your electrician install it on the next visit?
  • Landing page headline: "See what your garden house really costs — no Wi-Fi needed out there." Bullets: "Measures your outbuilding's power right in its fuse box." / "Talks over the existing cable — no extra network gear." / "Alerts when the sauna or frost heater is left on."
  • Pass threshold: 20 installers each committing to 5 pairs, or 100 paid €20 deposits in 6 weeks.

First production checklist

  • Samples: PLC modems/coupling transformers from the production supplier; metering IC calibration samples.
  • Golden sample: the safety-tested unit; freeze BOM (coupling parts are safety-critical).
  • DFM review: creepage/clearance, X-capacitor ratings, DIN-clip strength, terminal torque, CT connector.
  • MOQ talk: modem MOQ, coupling transformer (often custom), CT clamps.
  • QC/AQL: AQL II 0.65 safety; 100% hi-pot, 100% metering calibration at 2 loads, 100% PLC link test pairing the two units.
  • Packaging: pre-paired units in one box, wiring diagram, "not for billing" notice, QR onboarding.
  • Incoterms: FOB Shenzhen; DIN enclosures may be sourced as standard parts in the EU.
5 · Who to contact · from gongban.db

Who to contact

On file: 3 board publishers (Tuya Smart (涂鸦智能) and Seeed Studio and Hi-Link (海凌科)). Only useful once section 2 (validate demand) has passed. Everything below comes from gongban.db, the directory behind this site. It names the companies that publish the boards this idea is built from, the manufacturers on file, and directory entries in the same product category. None of it is a verified supplier relationship for this specific idea: nobody has quoted it yet. Company websites only; no personal contacts are published.

Board publishers (direct)

  • Tuya Smart (涂鸦智能) (涂鸦智能模组部门, developer.tuya.com) — platform + module maker; 151 boards in the catalogue; files via Tuya Smart public module documentation · developer.tuya.com/en/docs/iot/network-module-overview?id=Ka4z12ojepber. Directory entry: WiFi/BT/Zigbee smart home modules: CBU / WBR3 / BT3L modules; Alexa/Google certified; volume IoT OEM. Listed from Tuya's public developer documentation; Tuya is not affiliated with GONGBANS. Tuya modules can also be ordered through the Tuya developer platform, which covers the app and cloud side. Boards used here: Tuya S130N-ISI PLC module (powerline-carrier (PLC) communication module, station role). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.
  • Seeed Studio (矽递科技(深圳)有限公司, seeedstudio.com) — community / maker brand; 183 boards in the catalogue; files via Seeed Studio wiki catalog · github.com/Seeed-Studio/wiki-documents. Directory entry: IoT module + open hardware OEM: XIAO ESP32S3; Grove modules; LoRa gateway; Jetson carrier; OEM PCBA. Boards used here: Seeed Grove-Electricity Sensor (current-transformer sensing reference). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.
  • Hi-Link (海凌科) (深圳市海凌科电子有限公司, hlktech.com) — module maker; 155 boards in the catalogue; files via Hi-Link (Shenzhen Hi-Link Electronic) product catalogue · hlktech.com. Directory entry: WiFi / BLE / radar sensor / power module maker: WiFi & router modules (MT7688/MT7628/WiFi6); BLE modules; 5.8/10/24/60/79 GHz mmWave radar sensors; AC-DC & DC-DC power modules; face / fingerprint recognition modules. Datasheets are public on hlktech.com (download centre); anything beyond the public datasheets has to be asked from Hi-Link directly. Boards used here: HLK-PM01/PM03/PM12 etc. 3W AC-DC isolated power module, incl. 3W-B and 3W-C (with EMC circuit) (3 W isolated AC-DC supply). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.

Manufacturing (PCBA / EMS) on file

  • Kingbrother / King Brother Technology · global.kingbrother.com/ — PCB fab + EMS; see the Kingbrother SOM page on this site.
  • Foxlink (SZ) (正崴精密工业(深圳)有限公司) · foxconn.com — PCBA + cable assembly EMS: Cable assembly; PCBA; connector; OEM for major electronics brands.

Also in the directory (category match, not idea-specific)

Companies in the gongban.db solution-house directory whose product category overlaps this idea. They were matched on the idea's tags, not on this design; none has seen it.

  • Linkage Technology (深圳市联控智能科技有限公司) · linkage-tech.com — Smart meter / energy IoT solution house: Smart energy meter; sub-metering IoT; NB-IoT / LoRa; OEM/ODM. (Smart-metering / energy IoT)
  • Tuya Smart (涂鸦智能股份有限公司) · tuya.com — IoT platform + module solution house: WiFi/BT/Zigbee/BLE Mesh modules; 500+ product smart-home gongbans; global OEM APP. (Matter / Tuya smart-home modules and app platform)

MOQ and landed cost

gongban.db holds no MOQ, unit-price or tariff data for these companies, so none is shown. Get the numbers from the quote (the e-mail below asks for them) and run them through the landed-cost worksheet in the playbook. The starter BOM in the start kit section is an estimate, not a quote.

Outreach e-mail, ready to send

Fill in the [brackets], keep it short, and send it to the sales or "contact us" address on the company's own website. The Chinese version is the same letter; sending both in one mail is normal. How to read the reply: playbook → the first quote.

A. To a board publisher — samples and volume price (send to the sales / "contact us" address on the Tuya Smart (涂鸦智能) and Seeed Studio and Hi-Link (海凌科) websites)

A. 中文版

B. To a PCBA / EMS house — quote from the open design files (send to Kingbrother, Foxlink or any assembler you vet; see the playbook)

B. 中文版

6 · Next steps · this week

Next steps (this week)

  1. Send the S130N-ISI datasheet to an EMC lab and ask for a written opinion on EU conducted-emission limits for a 0–12 MHz PLC device; ask Tuya whether a matching coordinator is available for EU projects.
  2. Run the 10-garden link test with off-the-shelf powerline adapters and 868 MHz dev boards side by side.
  3. Interview 10 electricians who install saunas or garden offices about how outbuildings are fed and what they'd install.
Get this built

Want this built?

Get sourcing and manufacturing help from a team in Shenzhen and Europe.

Never built hardware? Start with the zero-experience founder playbook: samples, the first quote, CE/FCC, customs, logistics and the kill question, in order. Board facts come from the catalogue; everything else in this pack is an estimate.

Get this built →

Start pack powerline-outbuilding-meter · written by the GONGBANS inventor from the public catalogue and public sources. Concept generated by the GONGBANS inventor from the public catalogue, then expanded into a start pack. Not a product, not validated; every number (market, BOM, price, effort, certification cost) is a rough estimate to be checked, not a quote. Check each board's licence before commercial use. Not legal, tax or investment advice. Idea page · Download as Markdown · All 100 start packs →