Concept, not a product. Concept generated by the GONGBANS inventor from the public catalogue, then expanded into a start pack. Not a product, not validated; every number (market, BOM, price, effort, certification cost) is a rough estimate to be checked, not a quote. Check each board's licence before commercial use. Not legal, tax or investment advice.

New here? Start here → explains what a gongban is, the four steps and the first-timer mistakes. Come back to this pack afterwards.

Effort (estimate)8–10 team-weeks
Unit BOM (estimate)€25–35 (estimate)
Price (estimate)€OEM 49–69 / retrofit 129 (estimate)
Boards referenced4 catalogue boards

Order of operations: read the summary, then validate demand (section 2) with real customers before you touch the start kit or e-mail anyone in Who to contact (section 5). New to hardware? The zero-experience founder playbook covers validation, samples, the first quote, CE/FCC, customs and fulfilment for all 100 ideas.

1 · Summary · the one-page version

Summary

  • Problem: Acoustic pods and phone booths are in every hybrid office, and "stuffy pod" is the main complaint. Pods use PIR timers that switch light and fan off on people sitting still on a long call, or fans that run in empty pods all day. A single-person booth can reach well over 2,000 ppm CO2 within minutes if the fan is off or too slow (one public measurement on a well-known booth saw ~2,700 ppm with ventilation disabled).
  • Customer: Acoustic-pod and office-furniture makers (OEM design-in — they pay); facility managers retrofitting existing booths (second channel). Office workers use it without knowing.
  • Product: A compact controller: 24 GHz presence radar (still people), CO2/temperature/humidity sensor, mains-to-low-voltage isolated supply, PWM fan drive with a quiet curve, LED dimming, "occupied" light outside, optional usage data over Wi-Fi.
  • Why now: Pod volumes boomed with hybrid work; buyers ask about air quality; CO2 sensors (photoacoustic NDIR) and still-person radar cost a few euros.
  • The ask: ~€75k to EVT, certification and the first 1,000 controllers, ideally co-funded by an OEM's NRE for a design-in.
2 · Validate demand · before anything else

Validate demand first

Do this before anything else in this pack: before the business plan, before you order a sample board, and long before you e-mail a factory (section 5). The classic first-time mistake is to source and build first and find out later that nobody wanted it. Hardware mistakes are slow and expensive to undo; 15–20 conversations are cheap.

The gate: this idea's kill question

Will 2 pod manufacturers do a design-in for next year's model? OEM cycles are slow — get a letter of intent before tooling.

You pass this section when you can answer that question with evidence you collected yourself, not a guess: a measured conversion on a fake-door landing page for the consumer side and, for the business side, at least three decision-makers who put something on paper: a letter of intent, a paid pilot or a purchase order. Until then: no factory e-mail, no sample order, no firmware, no logo. If the answer is no, you have lost a few weeks and saved the rest.

Who you are looking for

The audience named in the idea: Acoustic-pod and office-furniture makers (OEM), facility managers retrofitting existing booths.

The problem as the pack states it: Acoustic pods and phone booths are in every hybrid office, and "stuffy pod" is the main complaint. Pods use PIR timers that switch light and fan off on people sitting still on a long call, or fans that run in empty pods all day. A single-person booth can reach well over 2,000 ppm CO2 within minutes if the fan is off or too slow (one public measurement on a well-known booth saw ~2,700 ppm with ventilation disabled).

Talk to the people who have the problem and the people who pay; in B2B they are often not the same person, and the one who pays decides.

Where to find them

Communities and associations where this audience actually talks, as far as we know them in November 2026. Confirm each is still active and read its rules on self-promotion before posting; most allow a genuine question about a problem and ban a pitch.

  • IFMA · ifma.org/ — facility managers; local chapters across Europe.
  • GEFMA · gefma.de/ — German facility-management association.

Beyond the named ones, the same four methods work for every idea on this site:

  • Search for communities around the problem, not the product: forums, Facebook groups, Discord servers and newsletters in your own country for the terms in the audience line above. Many of the best groups are national and in the local language; a Dutch or German group beats a global English one for an EU launch.
  • Trade associations and their regional meetings for the B2B audiences: one meeting puts twenty buyers in a room, and the association newsletter will often run a short survey for a member.
  • LinkedIn: search people by the job titles in the audience line, message ten a day with one question (not a pitch), and ask for twenty minutes. Expect one in five to say yes.
  • Your deposit list from the kill question and anyone who replied to the fake door: those are the first interviews, not the last.

The plan: 15–20 conversations, then a fake door

  1. 15–20 real conversations (ten buyers from the business side and ten from the consumer side), fifteen minutes each, using the script below. Before writing a line of code or ordering a board. Write up each one the same day: the problem in their words, what they do today, what it costs them, what they said when you named the price.
  2. A fake door. One page: the pitch as the headline, a rendered image or a photo of a cardboard mock-up, the price (€OEM 49–69 / retrofit 129 (estimate), the pack's estimate), and one button. Two buttons: a refundable deposit or waitlist for consumers, "request a pilot" for businesses.
  3. Send it to everyone you interviewed and post it, with the problem question first, in the communities above. Run it for two to four weeks.
  4. Count against the kill question. Then decide: go, change the idea, or stop.

Interview script (fifteen minutes, problem first)

Ask, then be quiet. Do not describe the product until question 5; if you pitch first you will only hear politeness.

Pre-order / pilot message (forum post or direct message)

Reading the signal

Real signalFalse positive
A refundable deposit, a signed LOI, a paid pilot, a calendar invite for the prototype"Sounds cool", "I would totally buy that", likes and upvotes
They describe the problem unprompted and in detail, with numbersThey agree with your description of the problem
They have already paid for a workaround (a product, a service, their own time)They have never tried anything and are not bothered
Landing-page conversion to deposit or form above the pack's pass mark, from cold trafficConversion from friends, family and your own network
A named budget and a named decision-maker (B2B)An enthusiastic user who cannot buy

Go / no-go

  • Go to section 3 (business plan) and section 4 (start kit) when the kill question above is met by your own numbers, you have 15–20 written-up conversations, and at least one real signal from the left column per segment you plan to sell to. Only then does section 5 (Who to contact) apply.
  • Change the idea when the problem is real but the price, the buyer or the form factor in the pitch is wrong: the interviews will tell you which. Rewrite the pitch and run the fake door again; this is normal and costs a week.
  • Stop when the kill question fails on honest numbers, or when nobody you talked to has paid for a workaround. Pick another idea on this site; the boards in the start kit are not wasted, only unused.

The full worksheet, with how to define the segment and run the fake door, is in the playbook → validate demand.

3 · Business plan · estimates, not a forecast

Business plan

Problem & customer

Pod makers compete on acoustics and design, and the electronics are often an afterthought: a PIR, a timer relay and a fan running at one speed. Customers then complain: too loud, too stuffy, or dark mid-call.

  • Who pays (primary): pod makers — tens of brands in Europe, especially in the Nordics, Baltics, Poland, Germany and the Netherlands. They buy a controller per pod (OEM price) and want EN 62368-1 reports and a stable supply.
  • Who pays (secondary): facility managers retrofitting existing pods (higher price, smaller volume, install effort).
  • Who uses: the person on the call — success is when they never think about the fan.
  • Reality: OEM design-in cycles are slow (6–18 months). Get a letter of intent before tooling.

Market size (estimates — check)

  • TAM: European office pod/booth market: assume 150–250k units sold per year across brands (estimate — verify with industry reports), plus an installed base of ~1M. Controller at €55 OEM = €8–14M/year new + retrofit potential ~€50–100M.
  • SAM: pod makers without an in-house electronics team (most small and mid-size brands): ~50% → €4–7M/year.
  • SOM (3 yrs): 3–5 OEM brands → 5–15k controllers/year, plus 1–2k retrofit kits.
AlternativeWhat it isWhy we still win
Do nothing / PIR + timer relayCheap, standard in many podsSwitches off on still people; fixed fan speed
Pod makers' in-house controllers (some premium brands have motion-based shut-off after e.g. 30 min, manual override)Integrated, brandedUsually PIR-based; CO2-driven ventilation is rare at mid-range
Generic demand-controlled ventilation controllers (building HVAC world, CO2 transmitters + occupancy)Proven in roomsSized for rooms/BMS, not a pod's 12–24 V fan and LED strip
DIY: smart plug + CO2 monitorCheapNot integrated, not certified for furniture
Facility "air quality" sensors (stand-alone CO2 monitors)Measure onlyDon't control anything

Wedge: a drop-in OEM controller with still-person radar + CO2 fan curve + quiet mode, delivered with test reports and a wiring harness to the pod maker's spec. "We fix your #1 complaint without you hiring an electronics team."

Product & value proposition

  • Hardware: one PCB in a small DIN-less enclosure that screws into the pod ceiling cavity. Mains input (100–240 VAC) → isolated 12 or 24 V via a 20 W AC-DC module; PWM drive for 1–2 DC fans (12/24 V), LED dimming channel, "occupied" indicator output; LD2410B radar facing the seat; SCD41 CO2/T/RH sensor in the airflow path (not right at the fan outlet).
  • Logic: presence holds light + fan; fan curve by CO2 (e.g. min speed at <800 ppm, ramp to max at 1,200 ppm), quiet mode cap; off after N minutes with nobody; post-occupancy purge for 2–5 minutes.
  • Options: Wi-Fi/BLE for usage data (occupancy minutes per pod, CO2 history) — sell as a data add-on to facility managers.
  • Pricing (estimates): OEM €49–69 per controller (incl. harness); retrofit kit €129 (controller + adapter + mounting + instructions for an electrician); data add-on €1–2/pod/month.

Unit economics (estimates, EUR per controller, OEM version without Wi-Fi)

Item1k5k
HLK-20M12/20M24-class 20 W AC-DC module5.04.0
SCD41 CO2/T/RH sensor12.09.5
LD2410B radar2.51.9
MCU, fan/LED MOSFET drivers, fuse, varistor, terminals, passives3.52.6
PCB 2-layer1.00.6
Assembly + test (hi-pot on mains side, fan PWM, CO2 sanity)3.02.0
Enclosure (flame-rated plastic, mains-side cover)2.51.6
Wiring harness to OEM spec3.02.2
Packaging (bulk)0.50.3
Freight + duty1.20.8
Certification amortised (€14k)14.02.8
Landed cost48.228.3
OEM net price (€59)5959
Gross margin OEM€10.8 (18%)€30.7 (52%)
Retrofit kit (€129 ex VAT, via reseller −30%, +€8 adapter/mounting)4256

The CO2 sensor is a third of the BOM — it's the cost lever. A cheaper NDIR at €6–8 can work for a pod (accuracy needs are modest); qualify one by DVT.

Go-to-market

First 100 customers (controllers → first OEM): list every pod/booth maker in Europe (Orgatec in Cologne and Stockholm Furniture Fair exhibitor lists are a ready-made lead list), call product managers, offer to retrofit 3 of their showroom/demo pods for free with CO2 logging before/after. Their sales teams love a "CO2 stays below 1,000 ppm" claim.

Then scale: OEM design-ins (annual model updates), office-furniture dealers selling retrofit kits, facility-service companies, workplace-analytics vendors buying the data add-on.

12-month plan

  • Q1: retrofit 3 demo pods with prototypes (Grove SCD41 + LD2410B + dev board + lab supply); CO2 before/after report; 10 OEM conversations (kill question).
  • Q2: own PCB rev A (mains-side design per EN 62368-1), harness, 20 units for 2 OEM evaluations.
  • Q3: rev B, certification (LVD/EMC/RED if radio), LOI → first 1,000-unit order.
  • Q4: retrofit kit via 1 furniture dealer; Wi-Fi data add-on EVT.

Team: founder on OEM sales (furniture industry contacts are gold), hardware engineer with mains-power experience (essential — contract is fine), firmware engineer (part-time), Shenzhen partner for PCBA + harness.

Funding to first 1,000 (estimate): landed hardware excl. cert €34k + tooling €6k + certification €14k + prototypes/evaluations €4k + 6 months part-time team €25k + fairs €4k = ≈€87k. OEM NRE (€10–20k for customisation) + 30% deposit on a 1,000-unit order (~€18k) covers a third to half. Rest: bootstrap/angel; OEM payment terms are usually net 30–60, so plan working capital.

Top risks

RiskMitigation
Market: OEM cycles are slow; LOI takes a yearRetrofit kits and demo-pod reports generate early revenue and proof
Safety: mains inside furniture — fire and shock riskUse a certified AC-DC module, proper creepage, fuse + varistor, flame-rated enclosure; EN 62368-1 report; recommend electrician install for retrofit
Technical: radar sees through pod walls (people passing outside)Mount facing the seat, limit range gates, test in glass-walled pods
Technical: CO2 sensor drift (ABC self-calibration assumes fresh air periods)Pods get fresh air when empty — ABC works; document calibration
Supply: SCD41 sole source (Sensirion) and price; Hi-Link modules contact-only design filesQualify a second NDIR sensor; AC-DC modules are standard footprints with alternatives
Noise: the fan curve makes noise on callsQuiet mode cap + slow ramps; test with the OEM's acoustic engineer
4 · Start kit · boards, BOM, build plan, certification

Start kit

Boards to start from

BoardLinkContributesFiles (catalogue)Licence note
HLK-LD2410B/LD2410C presence radargongbans.com/db/hilink-ld2410b.htmlDetects people sitting stillDatasheet public, design files via maker (no open schematics)Buy as module
Seeed Grove-CO2-Temperature-Humidity-Sensor-SCD41gongbans.com/db/seeed-grove-co2-temperature-humidity-sensor-scd41.htmlCO2/T/RH sensing referenceSchematic (open download)Seeed wiki resources — check licence
HLK-20Mxx 20 W AC-DC isolated module (incl. 20W-B, 20W-C)gongbans.com/db/hilink-20mxx.htmlMains → 12/24 V isolated for fan and LEDsDatasheet public, design files via maker (no open schematics)Buy as module; check its own safety approvals
Seeed Grove-MOSFETgongbans.com/db/seeed-grove-mosfet.htmlFan/LED PWM drive referenceSchematic (open download)Seeed wiki resources — check licence

Block diagram

100–240 VAC ─► fuse + varistor ─► HLK-20Mxx (20 W, isolated) ─► 12/24 V rail
                        ║ isolation (in module) ║                    │
                                                         ┌───────────┼──────────────┐
                                                    buck 3.3 V    MOSFET PWM     MOSFET PWM
                                                         │        fan(s)         LED strip
                                                        MCU ──────────────────────┘
                                          UART │          │ I²C        │ GPIO
                                      LD2410B radar   SCD41 CO2/T/RH   "occupied" light out
                                          (optional Wi-Fi/BLE for usage data)

Engineering gap: mains-side layout and safety (creepage, fusing, enclosure), fan acoustic tuning, sensor placement in the airflow, and the OEM harness.

Starter BOM (estimates)

PartEst. @1kNotes
HLK-20M24 (or 20M12)€4–5Check its own certifications (CE/UL/CB) — matters for your report
SCD41€9–12Sole source (Sensirion); alternatives: other NDIR modules
LD2410B€2–3Single source
MCU (e.g. small ARM or ESP32-C3 if Wi-Fi SKU)€0.8–2
2× logic-level MOSFET + gate drivers€0.6
Fuse, varistor, X-cap, terminals€1.5Mains terminals: use approved types
Enclosure V-0 plastic€2–2.5
Harness€2–3To OEM spec; 4–6 week lead

Firmware/software starting point

  • ESPHome for prototypes (has scd4x and ld2410 components — exist) on an ESP32 dev board: fastest way to the demo-pod CO2 report.
  • Production: simple bare-metal or Zephyr/ESP-IDF firmware; Sensirion publishes open embedded drivers for the SCD4x (search "Sensirion embedded-i2c-scd4x").
  • Fan curve + presence state machine: your own code — small and testable.

12-week build plan

WeeksGateExit criteria
1–2Validate — 10 OEM product-manager calls; CO2 log in 3 existing pods (borrow an office)≥2 OEMs agree to a demo-pod retrofit; measured CO2 peaks documented
3–5Works-like — ESPHome prototype (SCD41 + LD2410B + MOSFET + bench 24 V) in 3 demo podsCO2 held <1,000 ppm during 60-min calls; zero light-off events on still users
6–8Looks-like + EVT — rev A PCB with mains input, enclosure, harness; 20 units to 2 OEMsOEM acoustic/usability sign-off; hi-pot pass on all 20
9–10DVT + pre-compliance — EMC pre-scan (conducted + radiated), EN 62368-1 pre-assessment, radar RED pre-scanNo fails; lab confirms test plan; LOI from ≥1 OEM (kill question)
11–12Pilot batch — 50 controllers in an OEM's pilot production run≤1% install failures on the OEM line; OEM confirms order for next model year

Certification checklist (EU)

  • LVD (mains-powered): EN 62368-1 safety report — furniture makers will ask for it. Using a pre-certified AC-DC module helps but the controller needs its own assessment. Estimate €4–6k.
  • EMC Directive: EN 55032/55035 (or EN 61000-6-1/-6-3), conducted emissions from the PWM fan drive, harmonics/flicker EN 61000-3-2/-3-3. Estimate €3–5k.
  • RED because of the 24 GHz radar (and Wi-Fi/BLE if the data SKU): EN 300 440, EN 301 489-1/-3, EN 62311/62479 (+ EN 300 328/EN 301 489-17 for Wi-Fi/BLE). With a radio inside, RED replaces LVD/EMC as the legal route but the same safety/EMC standards apply. Estimate €4–6k.
  • EN 18031 + CRA only for the connected (Wi-Fi) SKU: SBOM, updates, vulnerability handling; CRA reporting from 11 Sep 2026, full from 11 Dec 2027.
  • RoHS, REACH, WEEE (B2B; the OEM may take over WEEE as the final product maker — agree in the contract), packaging EPR.
  • Ecodesign: the external fan/LED loads are the OEM's; your standby consumption should be low (<0.5 W target) — check applicable ecodesign standby rules.
  • GDPR: usage data per pod is anonymous occupancy; works councils may still ask — provide a one-page data description.
  • No battery, no medical, no toy.
  • Total estimate: €12–18k.

Validation toolkit

  • Kill question: Will 2 pod manufacturers do a design-in for next year's model? OEM cycles are slow — get a letter of intent before tooling. Cheapest experiment: retrofit one OEM's demo pod with the ESPHome prototype for 2 weeks and hand them the CO2 + occupancy report.
  • Interview script (5) — for pod makers: 1. What are the top 3 complaints you get from customers about your pods? 2. What controls fan and light today, and who designed it? 3. Do buyers ask about CO2 or air quality in tenders? Do you have numbers? 4. When is the next model update, and when do you freeze the electronics? 5. At €59 per controller with harness and test reports, what volume would you design in — and what would stop you?
  • Landing page (OEM-facing): Headline: "Fresh air and light that stay on for people sitting still." Bullets: "Radar presence — no more lights off mid-call." / "CO2-driven fan curve with a quiet mode." / "Drop-in controller with harness and EN 62368-1 report."
  • Pass: one signed LOI for ≥500 controllers/year, or 2 OEMs paying for evaluation units + NRE.

First production checklist

  • Samples: AC-DC modules with their certificates; SCD41 from authorised distribution.
  • Golden sample: hi-pot, EMC pass, OEM-approved acoustic fan curve, harness fit.
  • DFM: creepage/clearance on mains side, keyed connectors, strain relief, label with ratings.
  • MOQ: sensor MOQ via distributor, harness 500–1k, enclosure 1k shots.
  • QC/AQL: 100% hi-pot + functional (fan PWM, LED dimming, radar, CO2 reading in range), AQL 0.65 for safety items.
  • Packaging: bulk trays to the OEM line; installation sheet for retrofit kit (electrician install).
  • Incoterms: FOB Shenzhen; OEM may prefer DAP to their factory (Poland/Baltics/Nordics).
5 · Who to contact · from gongban.db

Who to contact

On file: 2 board publishers (Hi-Link (海凌科) and Seeed Studio). Only useful once section 2 (validate demand) has passed. Everything below comes from gongban.db, the directory behind this site. It names the companies that publish the boards this idea is built from, the manufacturers on file, and directory entries in the same product category. None of it is a verified supplier relationship for this specific idea: nobody has quoted it yet. Company websites only; no personal contacts are published.

Board publishers (direct)

  • Hi-Link (海凌科) (深圳市海凌科电子有限公司, hlktech.com) — module maker; 155 boards in the catalogue; files via Hi-Link (Shenzhen Hi-Link Electronic) product catalogue · hlktech.com. Directory entry: WiFi / BLE / radar sensor / power module maker: WiFi & router modules (MT7688/MT7628/WiFi6); BLE modules; 5.8/10/24/60/79 GHz mmWave radar sensors; AC-DC & DC-DC power modules; face / fingerprint recognition modules. Datasheets are public on hlktech.com (download centre); anything beyond the public datasheets has to be asked from Hi-Link directly. Boards used here: HLK-LD2410B/LD2410C 24 GHz human-presence radar module (24 GHz presence radar (still people)); HLK-20Mxx 20W AC-DC isolated power module, incl. 20W-B and 20W-C (20 W isolated AC-DC supply for fan and LEDs). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.
  • Seeed Studio (矽递科技(深圳)有限公司, seeedstudio.com) — community / maker brand; 183 boards in the catalogue; files via Seeed Studio wiki catalog · github.com/Seeed-Studio/wiki-documents. Directory entry: IoT module + open hardware OEM: XIAO ESP32S3; Grove modules; LoRa gateway; Jetson carrier; OEM PCBA. Boards used here: Seeed Grove-CO2-Temperature-Humidity-Sensor-SCD41 (CO2 / temperature / humidity sensing); Seeed Grove-MOSFET (fan PWM drive reference). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.

Manufacturing (PCBA / EMS) on file

  • Kingbrother / King Brother Technology · global.kingbrother.com/ — PCB fab + EMS; see the Kingbrother SOM page on this site.
  • Foxlink (SZ) (正崴精密工业(深圳)有限公司) · foxconn.com — PCBA + cable assembly EMS: Cable assembly; PCBA; connector; OEM for major electronics brands.

MOQ and landed cost

gongban.db holds no MOQ, unit-price or tariff data for these companies, so none is shown. Get the numbers from the quote (the e-mail below asks for them) and run them through the landed-cost worksheet in the playbook. The starter BOM in the start kit section is an estimate, not a quote.

Outreach e-mail, ready to send

Fill in the [brackets], keep it short, and send it to the sales or "contact us" address on the company's own website. The Chinese version is the same letter; sending both in one mail is normal. How to read the reply: playbook → the first quote.

A. To a board publisher — samples and volume price (send to the sales / "contact us" address on the Hi-Link (海凌科) and Seeed Studio websites)

A. 中文版

B. To a PCBA / EMS house — quote from the open design files (send to Kingbrother, Foxlink or any assembler you vet; see the playbook)

B. 中文版

6 · Next steps · this week

Next steps (this week)

  1. Build the lead list: every pod/booth exhibitor at the last Orgatec and Stockholm Furniture Fair; call 5 product managers with the interview script.
  2. Put a CO2 logger in 2 office phone booths for a day; screenshot the curve — that chart opens doors.
  3. Order a Grove SCD41, 2 LD2410B and a 24 V PSU; get the ESPHome fan-curve prototype running on a bench fan.
Get this built

Want this built?

Get sourcing and manufacturing help from a team in Shenzhen and Europe.

Never built hardware? Start with the zero-experience founder playbook: samples, the first quote, CE/FCC, customs, logistics and the kill question, in order. Board facts come from the catalogue; everything else in this pack is an estimate.

Get this built →

Start pack phone-booth-controller · written by the GONGBANS inventor from the public catalogue and public sources. Concept generated by the GONGBANS inventor from the public catalogue, then expanded into a start pack. Not a product, not validated; every number (market, BOM, price, effort, certification cost) is a rough estimate to be checked, not a quote. Check each board's licence before commercial use. Not legal, tax or investment advice. Idea page · Download as Markdown · All 100 start packs →