Concept, not a product. Concept generated by the GONGBANS inventor from the public catalogue, then expanded into a start pack. Not a product, not validated; every number (market, BOM, price, effort, certification cost) is a rough estimate to be checked, not a quote. Check each board's licence before commercial use. Not legal, tax or investment advice.

New here? Start here → explains what a gongban is, the four steps and the first-timer mistakes. Come back to this pack afterwards.

CategoryAudio
Effort (estimate)10 team-weeks
Unit BOM (estimate)€60–90
Price (estimate)€349–449
External market checkLikely (Contested)
Boards referenced5 catalogue boards

Order of operations: read the summary, then validate demand (section 2) with real customers before you touch the start kit or e-mail anyone in Who to contact (section 5). New to hardware? The zero-experience founder playbook covers validation, samples, the first quote, CE/FCC, customs and fulfilment for all 50 ideas.

1 · Summary · the one-page version

Summary

  • Problem: Small stages have no cue lights: the stage manager whispers, waves or texts, and missed cues follow. Professional sets exist but cost $485–985 and are sized for venues with a budget line for them.
  • Customer: Amateur dramatic societies (thousands in DE/UK/NL), school and university theatres, churches staging productions, small AV and event-hire companies. The society treasurer, the school drama department or the hire company pays.
  • Product: A stage-manager master with four lit channel buttons and four battery outstations with a big lit button and a buzzer; standby flashes, go is solid, the operator acknowledges; ESP-NOW link with retries and a link-health light; charges over USB-C. Target price €349–449 (estimate).
  • Why now: Amateur and school stages run cues by whisper and WhatsApp; the professional cue-light systems start around $485 and go to $985 (research, Nov 2026); ESP-NOW and lit buttons make a reliable set buildable from catalogue parts.
  • The ask: ~€45–60k to certification and a first 500 sets (estimate); federation pre-orders cover a third.

External market check (November 2026): LIKELY (CONTESTED). The real incumbent, DSan PerfectCue / CueLight, sells at $485–985, not the £1.5–4k first assumed; the gap holds at 30–55% cheaper but is smaller than first thought. Blue Room forum threads and a Hackaday cue-light project show DIY demand. Main risk: A smaller price gap than assumed: the package and simplicity for amateur groups must carry the pitch alongside price. As researched November 2026 by web search; verify before relying on it. Verdicts are a reading of the evidence found, not a forecast. Competitors and sources found: see the market check in the competition table.

2 · Validate demand · before anything else

Validate demand first

Do this before anything else in this pack: before the business plan, before you order a sample board, and long before you e-mail a factory (section 5). The classic first-time mistake is to source and build first and find out later that nobody wanted it. Hardware mistakes are slow and expensive to undo; 15–20 conversations are cheap.

The gate: this idea's kill question

Do 10 amateur groups from one federation pre-order the five-piece set at €399 after a video demo? Pass = 10 deposits in 6 weeks.

You pass this section when you can answer that question with evidence you collected yourself, not a guess: a measured conversion on a fake-door landing page for the consumer side and, for the business side, at least three decision-makers who put something on paper: a letter of intent, a paid pilot or a purchase order. Until then: no factory e-mail, no sample order, no firmware, no logo. If the answer is no, you have lost a few weeks and saved the rest.

Who you are looking for

The audience named in the idea: Amateur theatre federations (BDAT in Germany, Little Theatre Guild in the UK), school and university theatres, churches with productions, small AV hire companies.

The problem as the pack states it: Small stages have no cue lights: the stage manager whispers, waves or texts, and missed cues follow. Professional sets exist but cost $485–985 and are sized for venues with a budget line for them.

Talk to the people who have the problem and the people who pay; in B2B they are often not the same person, and the one who pays decides.

Where to find them

Communities and associations where this audience actually talks, as far as we know them in November 2026. Confirm each is still active and read its rules on self-promotion before posting; most allow a genuine question about a problem and ban a pitch.

  • r/techtheatre · reddit.com/r/techtheatre/ — stage managers and technicians, many in schools and amateur theatre.
  • The Blue Room (UK) · blue-room.org.uk/ — UK technical-theatre forum; DIY cue-light threads live here.
  • Hackaday / hackaday.io · hackaday.io/ — maker audience; visibility more than buyers.

Beyond the named ones, the same four methods work for every idea on this site:

  • Search for communities around the problem, not the product: forums, Facebook groups, Discord servers and newsletters in your own country for the terms in the audience line above. Many of the best groups are national and in the local language; a Dutch or German group beats a global English one for an EU launch.
  • Trade associations and their regional meetings for the B2B audiences: one meeting puts twenty buyers in a room, and the association newsletter will often run a short survey for a member.
  • LinkedIn: search people by the job titles in the audience line, message ten a day with one question (not a pitch), and ask for twenty minutes. Expect one in five to say yes.
  • Your deposit list from the kill question and anyone who replied to the fake door: those are the first interviews, not the last.

The plan: 15–20 conversations, then a fake door

  1. 15–20 real conversations (ten buyers from the business side and ten from the consumer side), fifteen minutes each, using the script below. Before writing a line of code or ordering a board. Write up each one the same day: the problem in their words, what they do today, what it costs them, what they said when you named the price.
  2. A fake door. One page: the pitch as the headline, a rendered image or a photo of a cardboard mock-up, the price (€349–449, the pack's estimate), and one button. Two buttons: a refundable deposit or waitlist for consumers, "request a pilot" for businesses.
  3. Send it to everyone you interviewed and post it, with the problem question first, in the communities above. Run it for two to four weeks.
  4. Count against the kill question. Then decide: go, change the idea, or stop.

Interview script (fifteen minutes, problem first)

Ask, then be quiet. Do not describe the product until question 5; if you pitch first you will only hear politeness.

Pre-order / pilot message (forum post or direct message)

Reading the signal

Real signalFalse positive
A refundable deposit, a signed LOI, a paid pilot, a calendar invite for the prototype"Sounds cool", "I would totally buy that", likes and upvotes
They describe the problem unprompted and in detail, with numbersThey agree with your description of the problem
They have already paid for a workaround (a product, a service, their own time)They have never tried anything and are not bothered
Landing-page conversion to deposit or form above the pack's pass mark, from cold trafficConversion from friends, family and your own network
A named budget and a named decision-maker (B2B)An enthusiastic user who cannot buy

Go / no-go

  • Go to section 3 (business plan) and section 4 (start kit) when the kill question above is met by your own numbers, you have 15–20 written-up conversations, and at least one real signal from the left column per segment you plan to sell to. Only then does section 5 (Who to contact) apply.
  • Change the idea when the problem is real but the price, the buyer or the form factor in the pitch is wrong: the interviews will tell you which. Rewrite the pitch and run the fake door again; this is normal and costs a week.
  • Stop when the kill question fails on honest numbers, or when nobody you talked to has paid for a workaround. Pick another idea on this site; the boards in the start kit are not wasted, only unused.

The full worksheet, with how to define the segment and run the fake door, is in the playbook → validate demand.

3 · Business plan · estimates, not a forecast

Business plan

Problem & customer

Cue lights are the standard way a stage manager tells lighting, sound, fly and stage crew when to stand by and when to go. Professional venues wire them in; everyone below that improvises. The professional portable systems (DSan PerfectCue and CueLight, $485–985) are good but priced for professionals; amateur groups, schools and churches, which stage most of the productions in Europe by number, run without.

Who pays: the society or school (B2B-ish, small budgets, grant-funded equipment purchases), the AV hire company (buys several sets, rents them). Who uses: volunteers, so set-up must be nothing: switch on, pair, go.

Market size (estimates — check)

  • TAM: amateur theatre groups in DE (~2,500 in BDAT), UK (~2,500 affiliated), NL/AT/CH, plus schools with a stage (tens of thousands) and churches. Theoretical €10–20M.
  • SAM: groups that stage two or more productions a year and own some kit: estimate 10,000 → €4M.
  • SOM (3 yrs): 2,000–3,000 sets; year-1: 400–600, mostly through two federations and one hire company.

Competition (3 searches, incl. the November 2026 external market check)

AlternativeWhat it is / price foundWhy we still win
DSan PerfectCue / CueLightProfessional portable cue lights; $485–985 (research, Nov 2026)30–55% cheaper with the same standby/go/acknowledge logic; sized and priced for amateurs
Interspace Industries and wired venue systemsInstalled systems, quote-basedDifferent market; we are portable and battery
WhatsApp, headsets, hand signalsFreeMissed cues; headsets cost more than our set
DIY cue-light projects (Blue Room forum, Hackaday)Arduino / ESP32 buildsDemand signal; nobody ships a boxed set

Wedge: a boxed, charged, paired-out-of-the-box set at €399 for the people who today whisper; the gap against the entry-level professional set is 30–55%, not a multiple, so the simplicity matters as much as the price.

External market check

Competitors, demand signals and price comparables found by web search in November 2026. Sources are named as found and not linked; as researched November 2026 by web search; verify before relying on it. Verdicts are a reading of the evidence found, not a forecast.

Who / sourceWhat it isWhat it tells us
DSan PerfectCue / CueLight$485–985 portable cue lightsIncumbent; the target is 30–55% below it
Blue Room forum DIY threadsTechnicians building their ownDemand signal
Hackaday cue-light projectMaker buildDemand signal, no boxed product

Verdict as researched: LIKELY (CONTESTED). Main risk: A smaller price gap than assumed: the package and simplicity for amateur groups must carry the pitch alongside price.

Product & value proposition

  • Master: four channels, lit buttons (amber standby, green go), per-channel acknowledge indication, link-health light, USB-C charged.
  • Outstation: one big lit button, buzzer (switchable), belt clip and magnet, 20-hour battery (estimate).
  • Radio: ESP-NOW on 2.4 GHz with acknowledgements and retries; channel scan at start; range tested across a 30 m hall with walls.
  • Expand to eight outstations; no app, no WiFi needed; firmware update over USB.

Unit economics (estimates, EUR per unit)

Item1k units5k units
Electronics BOM (estimate, mid of €60–90)75.060.0
PCBA assembly + test8.05.2
Enclosure / mechanics (tooling amortised separately)14.09.8
Packaging, cable, leaflet6.04.5
Freight + duty to EU (air at 1k, sea at 5k; check the HS code)5.02.5
Certification amortised (€10k, estimate)10.02.0
Landed cost118.084.0
Channel cost (direct + theatre suppliers, ~€30 per set)30.030.0
Net price received (€399 incl. 19% VAT → €335.3 ex VAT)335.3335.3
Gross margin per unit€187.3 (56%)€221.3 (66%)

Lesson: a five-piece set carries five enclosures and five batteries; the margin lives in the second run and in extra outstations sold separately.

Go-to-market

First 100 customers:

  1. Ten groups from one federation after a video demo and a loaner set at a festival weekend.
  2. One AV hire company buying five sets.
  3. Drama departments via their teachers' association.

Scale channels: theatre suppliers (Thomann, Stage Depot), federation newsletters and festivals, school equipment catalogues.

12-month plan

QuarterMilestones
Q1Kill-question conversations; works-like set on five AtomS3 + ByteButton/Button units; range test in a hall.
Q2Custom PCBs (master, outstation); enclosures; EVT 10 sets with two groups.
Q3DVT; certification; 200 sets; federation pre-orders shipped.
Q4Supplier listing; 500 sets; eight-channel master.

Team: one embedded engineer, one founder from the theatre world; enclosure design bought in.

Funding to first production (estimates): NRE €22k (two PCBs, two enclosures) + certification €10k + first 500 sets landed ~€45k ≈ €77k; minus pre-orders ~€20k ≈ €57k.

Top risks

RiskMitigation
Gap against DSan is smaller than hopedCompete on the amateur-sized package and simplicity; do not overclaim the price gap
Radio reliability in a steel-framed hallAcknowledged protocol, retries, link-health light, channel scan; test early
Battery and enclosure cost of five piecesShared enclosure for master and outstation; one battery type
Volunteers lose outstationsSell singles; magnet and clip; bright colour
4 · Start kit · boards, BOM, build plan, certification

Start kit

Boards to start from

The AtomS3 Lite and the button units are M5Stack products with published module files; the Seeed RGB board gives the open indicator circuit. Two PCBs: master and outstation.

Block diagram

  MASTER: [4 lit buttons] -> [ESP32-S3] -> ESP-NOW ->  OUTSTATION 1..8: [ESP32-S3] -> [big lit button] [buzzer]
           [link light]       [USB-C + cell]                            [USB-C + cell] [clip/magnet]
  standby = flashing amber, go = solid green, ack = button press echoed to master

Starter BOM (estimates)

PartEst. € (1k)Note
ESP32-S3 modules ×512.5
Lit buttons (master 4 + outstations 4)10.0
Li-ion cells + chargers ×512.0
Buzzers ×42.0
Enclosures ×514.0one shared design
PCBs, USB-C, passives8.0
Case / pouch for the set6.0

Firmware/software starting point

  • ESP-IDF, ESP-NOW with application-level acks and sequence numbers; channel selection at power-up; pairing by holding buttons.
  • State machine per channel: idle / standby / go / acknowledged; buzzer patterns.
  • Battery gauge and low-battery flash; USB firmware update.

12-week build plan

  1. Interviews; fake door with a demo video
  2. Prototype five units
  3. Protocol: acks, retries, range test
  4. Button and lamp design
  5. Two PCBs v1
  6. Enclosure design
  7. EVT 10 sets
  8. Two productions run with it
  9. Tooling decision
  10. DVT sets
  11. Pre-compliance
  12. Certification; pre-order shipping

Certification checklist (EU)

  • RED via the module's own radio reports (EN 300 328 / EN 300 220 as applicable, EN 301 489 EMC), EN 18031 cybersecurity for the connected variant, EN 62368-1 safety (USB-powered, no mains inside), RoHS/REACH, WEEE registration per country, CRA vulnerability-handling process.
  • Test with the DVT build in the real enclosure; budget a re-spin for EMC.
  • Lab cost: a few thousand euros for a USB-powered device with a pre-certified module, more with battery or multiple radios (estimate; get two quotes).
  • Battery Regulation (EU) 2023/1542 and UN 38.3 for the lithium cell; user-replaceable or documented removal.

Validation toolkit

  • Kill question: Do 10 amateur groups from one federation pre-order the five-piece set at €399 after a video demo? Pass = 10 deposits in 6 weeks.
  • Cheapest experiment: Film a 60-second demo of the five-unit prototype in a real tech rehearsal; post it in two federation groups with a €399 pre-order link.
  • 5-question interview: 1) How do you call cues today and what went wrong last show? 2) Have you priced cue lights; which and why not? 3) Who signs off equipment purchases and from what budget? 4) How many positions need a light? 5) At €399 for master plus four, would you order for the next production?
  • Landing page: headline "Standby. Go. No whispering." Bullets: five pieces, charged, paired; works through walls; €399. Button: refundable €50 deposit.
  • Pass threshold: 10 deposits from one federation in 6 weeks.

First production checklist

  • 10 golden samples measured and photographed; one per enclosure colour.
  • DFM review with the PCBA house: test pads, programming jig, serial/MAC provisioning, who holds the signing keys (you).
  • MOQ talk: module, enclosure, packaging; get the next price break in writing.
  • QC: AQL II 2.5/4.0; 100% functional test incl. radio; burn-in sample.
  • Packaging and label: CE, WEEE bin, responsible-person address, model/serial; manual with safety and disposal text.
  • Incoterm and shipping: DDP by courier for the first run; forwarder quote for the second.
5 · Who to contact · from gongban.db

Who to contact

On file: 2 board publishers (M5Stack and Seeed Studio). Only useful once section 2 (validate demand) has passed. Everything below comes from gongban.db, the directory behind this site. It names the companies that publish the boards this idea is built from, the manufacturers on file, and directory entries in the same product category. None of it is a verified supplier relationship for this specific idea: nobody has quoted it yet. Company websites only; no personal contacts are published.

Board publishers (direct)

  • M5Stack — community / maker brand; 274 boards in the catalogue; files via M5Stack M5_Hardware repo · github.com/m5stack/M5_Hardware. Boards used here: M5Stack AtomS3-Lite (C124) (ESP32-S3 core for master and outstations (ESP-NOW)); M5Stack Unit ByteButton (U192) (RGB-lit button bar for the master); M5Stack Unit Button (U027) (single big button for an outstation); M5Stack Unit Buzzer (U132) (acknowledge beep). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.
  • Seeed Studio (矽递科技(深圳)有限公司, seeedstudio.com) — community / maker brand; 183 boards in the catalogue; files via Seeed Studio wiki catalog · github.com/Seeed-Studio/wiki-documents. Directory entry: IoT module + open hardware OEM: XIAO ESP32S3; Grove modules; LoRa gateway; Jetson carrier; OEM PCBA. Boards used here: Seeed Grove-Chainable RGB LED (open RGB indicator circuit for the outstation lamp). What to ask for: sample units of the SKUs above, unit pricing at 100 / 500 / 1,000, whether a customised variant is possible (and its NRE and MOQ), and the module's radio test reports if any.

Manufacturing (PCBA / EMS) on file

  • Kingbrother / King Brother Technology · global.kingbrother.com/ — PCB fab + EMS; see the Kingbrother SOM page on this site.
  • Foxlink (SZ) (正崴精密工业(深圳)有限公司) · foxconn.com — PCBA + cable assembly EMS: Cable assembly; PCBA; connector; OEM for major electronics brands.

Also in the directory (category match, not idea-specific)

Companies in the gongban.db solution-house directory whose product category overlaps this idea. They were matched on the idea's tags, not on this design; none has seen it.

  • GREPOW (深圳格瑞普电池有限公司) · grepow.com — High-rate Li-Po / NiMH battery OEM: High-drain Li-Po; shaped/custom battery; NiMH; UAV battery. (Custom Li-Po / NiMH batteries)
  • AI-Thinker (安信可科技(深圳)有限公司) · ai-thinker.com — ESP8266 / ESP32 module OEM: ESP-01; ESP32-CAM; A9 GSM modules; massive community. (ESP32 / ESP8266 modules)

MOQ and landed cost

gongban.db holds no MOQ, unit-price or tariff data for these companies, so none is shown. Get the numbers from the quote (the e-mail below asks for them) and run them through the landed-cost worksheet in the playbook. The starter BOM in the start kit section is an estimate, not a quote.

Outreach e-mail, ready to send

Fill in the [brackets], keep it short, and send it to the sales or "contact us" address on the company's own website. The Chinese version is the same letter; sending both in one mail is normal. How to read the reply: playbook → the first quote.

A. To a board publisher — samples and volume price (send to the sales / "contact us" address on the M5Stack and Seeed Studio websites)

A. 中文版

B. To a PCBA / EMS house — quote from the open design files (send to Kingbrother, Foxlink or any assembler you vet; see the playbook)

B. 中文版

6 · Next steps · this week

Next steps (this week)

  1. Run section 2 (validate demand): book the first ten conversations and put the fake door up before touching a board.
  2. Order the sample boards in the start kit (three of each) and build the works-like prototype on the desk.
  3. Send e-mail A to the board publisher and e-mail B to one PCBA house (section on who to contact) to learn the real numbers behind the estimates above.
Get this built

Want this built?

Get sourcing and manufacturing help from a team in Shenzhen and Europe.

Never built hardware? Start with the zero-experience founder playbook: samples, the first quote, CE/FCC, customs, logistics and the kill question, in order. Board facts come from the catalogue; everything else in this pack is an estimate.

Get this built →

Start pack cue-light-system · written by the GONGBANS inventor from the public catalogue and public sources. Concept generated by the GONGBANS inventor from the public catalogue, then expanded into a start pack. Not a product, not validated; every number (market, BOM, price, effort, certification cost) is a rough estimate to be checked, not a quote. Check each board's licence before commercial use. Not legal, tax or investment advice. Idea page · Download as Markdown · All 50 start packs →